A hybrid scheduling decision support model for minimizing job tardiness in a make-to-order based mould manufacturing environment
暂无分享,去创建一个
George T. S. Ho | S. K. Kwok | C. K. Kwong | King Lun Choy | Harry K. H. Chow | T. C. Poon | Y. K. Leung
[1] Baoding Liu,et al. Parallel machine scheduling models with fuzzy processing times , 2004, Inf. Sci..
[2] B. Lin,et al. Bicriteria scheduling in a two-machine permutation flowshop , 2006 .
[3] Pei-Chann Chang,et al. A hybrid genetic algorithm with dominance properties for single machine scheduling with dependent penalties , 2009 .
[4] Cristóvão Silva,et al. MAPP - A web-based decision support system for the mould industry , 2006, Decis. Support Syst..
[5] Subhash C. Sarin,et al. A heuristic to minimize total flow time in permutation flow shop , 2009 .
[6] Jose A. Ventura,et al. Single-machine earliness-tardiness scheduling about a common due date with tolerances , 1996 .
[7] Norbert Trautmann,et al. An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem , 2008 .
[8] Wen-Jinn Chen,et al. Minimizing number of tardy jobs on a single machine subject to periodic maintenance , 2009 .
[9] Michel Gendreau,et al. Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound , 2009, Comput. Oper. Res..
[10] Douglas R. Moodie,et al. Pricing and lead time decisions for make-to-order firms with contingent orders , 1999, Eur. J. Oper. Res..
[11] S. Sridharan,et al. Managing capacity in tightly constrained systems , 1998 .
[12] K. E. Thurley,et al. THE SUPERVISOR'S ROLE IN PRODUCTION CONTROL , 1961 .
[13] Bajis M. Dodin,et al. Production , Manufacturing and Logistics Integration of equipment planning and project scheduling , 2007 .
[14] Peter L. Lee,et al. An integrated Petri net and GA based approach for scheduling of hybrid plants , 2007, Comput. Ind..
[15] Clarence H. Martin,et al. A hybrid genetic algorithm/mathematical programming approach to the multi-family flowshop scheduling problem with lot streaming , 2009 .
[16] B. Kingsman,et al. Production planning systems and their applicability to make-to-order companies , 1989 .
[17] Z. Degraeve,et al. HOP: A software tool for production scheduling at Bridgestone/Firestone off-the-road , 1998, Eur. J. Oper. Res..
[18] P. Pongcharoena,et al. Determining optimum Genetic Algorithm parameters for scheduling the manufacturing and assembly of complex products , 2002 .
[19] Haibing Li,et al. Minimizing total completion time in two-machine flow shops with exact delays , 2008, Comput. Oper. Res..
[20] Chisu Wu,et al. Genetic-algorithm-based real-time task scheduling with multiple goals , 2004, J. Syst. Softw..
[21] Dug Hee Moon,et al. Determination of optimal production rates on a single facility with dependent mold lifespan , 1998 .
[22] Reza Tavakkoli-Moghaddam,et al. A new decision-making structure for the order entry stage in make-to-order environments , 2008 .
[23] Xianpeng Wang,et al. A population-based variable neighborhood search for the single machine total weighted tardiness problem , 2009, Comput. Oper. Res..
[24] Yih-Long Chang,et al. A scatter search approach to sequence-dependent setup times job shop scheduling , 2009 .
[25] Tamás Kis,et al. Job-shop scheduling with processing alternatives , 2003, Eur. J. Oper. Res..
[26] P. Shahabudeen,et al. An improved genetic algorithm for the flowshop scheduling problem , 2009 .
[27] Iiro Harjunkoski,et al. Production optimization for continuously operated processes with optimal operation and scheduling of multiple units , 2006, Comput. Chem. Eng..
[28] Wen Feng Lu,et al. Business information modelling for process integration in the mold making industry , 2007 .
[29] Carsten Franke,et al. Development of scheduling strategies with Genetic Fuzzy systems , 2008, Appl. Soft Comput..