Allocation of Risks Under Build-Operate-Transfer Delivery Approach for Transport Infrastructure Projects
暂无分享,去创建一个
[1] Liyin Shen,et al. APPLICATION OF BOT SYSTEM FOR INFRASTRUCTURE PROJECTS IN CHINA , 1996 .
[2] Robert L. K. Tiong. Impact of Financial Package versus Technical Solution in a BOT Tender , 1995 .
[3] Neil S. Grigg,et al. Infrastructure engineering and management , 1988 .
[4] Kris R. Nielsen. Risk Allocation in Design-Build and BOT Projects , 1998 .
[5] R. Tiong,et al. Critical Success Factors in Winning BOT Contracts , 1992 .
[6] Robert L. K. Tiong. Competitive advantage of equity in BOT tender , 1995 .
[7] R. Tiong. CSFs in Competitive Tendering and Negotiation Model for BOT Projects , 1996 .
[8] Robert L. K. Tiong. RISKS AND GUARANTEES IN BOT TENDER , 1995 .
[9] Esther Malini,et al. RISK ANALYSIS OF BOT APPROACHES FOR DEVELOPING TRANSPORT INFRASTRUCTURE , 1996 .
[10] Robert L. K. Tiong,et al. Automated Approach to Negotiation of BOT Contracts , 1997 .
[11] Robert L. K. Tiong. Comparative Study of BOT Projects , 1990 .
[12] R. Tiong,et al. Political Risks: analysis of Key Contract Clauses in China’s BOT Project , 1999 .
[13] Balkiz Öztemir,et al. BOT Risks and Their Correlations , 2000 .
[14] Robert L. K. Tiong,et al. Final Negotiation in Competitive BOT Tender , 1997 .
[15] Robert L. K. Tiong,et al. Evaluation and Competitive Tendering of BOT Power Plant Project in China , 1998 .
[16] P Reina. RISING RISKS MARK BIG BRITISH BOT BRIDGE , 1994 .
[17] ShouQing Wang,et al. Evaluation and Management of Political Risks in China's BOT Projects , 2000 .