Allocation of Risks Under Build-Operate-Transfer Delivery Approach for Transport Infrastructure Projects

The need for the build-operate-transfer (BOT) approach in the development of infrastructure projects has risen in recent years, due to budgetary and financial constraints faced by the public sector in both developing and developed countries, tightened by the necessity to repair, maintain, and modernize the existing infrastructure facilities. Risk factors that influence the parties of a prospective BOT contract during the various phases of the contract are presented. In particular, the factors pertaining to the precontract stage and to the political, construction, commercial, and financial categories of possible risks are addressed. Integrated schemes assimilating the risks involved and the corresponding alleviation measures are offered.

[1]  Liyin Shen,et al.  APPLICATION OF BOT SYSTEM FOR INFRASTRUCTURE PROJECTS IN CHINA , 1996 .

[2]  Robert L. K. Tiong Impact of Financial Package versus Technical Solution in a BOT Tender , 1995 .

[3]  Neil S. Grigg,et al.  Infrastructure engineering and management , 1988 .

[4]  Kris R. Nielsen Risk Allocation in Design-Build and BOT Projects , 1998 .

[5]  R. Tiong,et al.  Critical Success Factors in Winning BOT Contracts , 1992 .

[6]  Robert L. K. Tiong Competitive advantage of equity in BOT tender , 1995 .

[7]  R. Tiong CSFs in Competitive Tendering and Negotiation Model for BOT Projects , 1996 .

[8]  Robert L. K. Tiong RISKS AND GUARANTEES IN BOT TENDER , 1995 .

[9]  Esther Malini,et al.  RISK ANALYSIS OF BOT APPROACHES FOR DEVELOPING TRANSPORT INFRASTRUCTURE , 1996 .

[10]  Robert L. K. Tiong,et al.  Automated Approach to Negotiation of BOT Contracts , 1997 .

[11]  Robert L. K. Tiong Comparative Study of BOT Projects , 1990 .

[12]  R. Tiong,et al.  Political Risks: analysis of Key Contract Clauses in China’s BOT Project , 1999 .

[13]  Balkiz Öztemir,et al.  BOT Risks and Their Correlations , 2000 .

[14]  Robert L. K. Tiong,et al.  Final Negotiation in Competitive BOT Tender , 1997 .

[15]  Robert L. K. Tiong,et al.  Evaluation and Competitive Tendering of BOT Power Plant Project in China , 1998 .

[16]  P Reina RISING RISKS MARK BIG BRITISH BOT BRIDGE , 1994 .

[17]  ShouQing Wang,et al.  Evaluation and Management of Political Risks in China's BOT Projects , 2000 .