Planning electricity transmission to accommodate renewables: Using two-stage programming to evaluate flexibility and the cost of disregarding uncertainty

We develop a stochastic two-stage optimisation model that captures the multistage nature of electricity transmission planning under uncertainty and apply it to a stylised representation of the Great Britain (GB) network. In our model, a proactive transmission planner makes investment decisions in two time periods, each time followed by a market response. This model allows us to identify robust first-stage investments and estimate the value of information in transmission planning, the costs of ignoring uncertainty, and the value of flexibility. Our results show that ignoring risk has quantifiable economic consequences, and that considering uncertainty explicitly can yield decisions that have lower expected costs than traditional deterministic planning methods. Furthermore, the best plan under a risk-neutral criterion can differ from the best under risk-aversion.

[1]  Feng Gao,et al.  Overview of transmission expansion planning using real options analysis , 2005 .

[2]  Leonard J. Savage,et al.  The Theory of Statistical Decision , 1951 .

[3]  B. Hobbs,et al.  The economics of planning electricity transmission to accommodate renewables: Using two-stage optimisation to evaluate flexibility and the cost of disregarding uncertainty , 2012 .

[4]  Andreas Schröder,et al.  Integrated Electricity Generation Expansion and Transmission Capacity Planning: An Application to the Central European Region , 2012 .

[5]  B. Hobbs,et al.  Risk aversion and CO2 regulatory uncertainty in power generation investment: Policy and modeling implications , 2010 .

[6]  M. Shahidehpour,et al.  Congestion-Driven Transmission Planning Considering the Impact of Generator Expansion , 2008, IEEE Transactions on Power Systems.

[7]  Andreas Ehrenmann,et al.  Space and Time: Wind in an Investment Planning Model , 2006 .

[8]  S. Binato,et al.  Value-Based Transmission Expansion Planning of Hydrothermal Systems Under Uncertainty , 2007, IEEE Transactions on Power Systems.

[9]  M. Shahidehpour,et al.  Market based transmission planning under uncertainties , 2005, 2004 International Conference on Probabilistic Methods Applied to Power Systems.

[10]  P. J. Tavner,et al.  Review of early operation of UK Round 1 offshore wind farms , 2010, IEEE PES General Meeting.

[11]  Vladimir Parail,et al.  Can Merchant Interconnectors Deliver Lower and More Stable Prices? The Case of NorNed , 2009 .

[12]  David G. Groves,et al.  A General, Analytic Method for Generating Robust Strategies and Narrative Scenarios , 2006, Manag. Sci..

[13]  H. M. Merrill,et al.  Conflicting objectives and risk in power system planning , 1993 .

[14]  S. Oren,et al.  Proactive planning and valuation of transmission investments in restructured electricity markets , 2006 .

[15]  F. Olsina,et al.  Valuing Flexibility of DG Investments in Transmission Expansion Planning , 2007, 2007 IEEE Lausanne Power Tech.

[16]  C. Gatzen,et al.  Planning of the grid integration of wind energy in Germany onshore and offshore up to the year 2020 , 2006 .

[17]  Nathanael Greene,et al.  Small and Clean Is Beautiful: Exploring the Emissions of Distributed Generation and Pollution Prevention Policies , 2000 .

[18]  John R. Birge,et al.  The value of the stochastic solution in stochastic linear programs with fixed recourse , 1982, Math. Program..

[19]  R. Clemen,et al.  Soft Computing , 2002 .

[20]  B. Hobbs,et al.  Improved Transmission Representations in Oligopolistic Market Models: Quadratic Losses, Phase Shifters, and DC Lines , 2008, IEEE Transactions on Power Systems.

[21]  Robert J. Thomas,et al.  Transmission System Planning-The Old World Meets The New , 2005, Proceedings of the IEEE.

[22]  Karsten Neuhoff,et al.  Modelling Wind in the Electricity Sector , 2007 .

[23]  J. Morbée,et al.  Risk Management in Electricity Markets: Hedging and Market Incompleteness , 2008 .

[24]  B. Hobbs,et al.  Analysis of multi-pollutant policies for the U.S. power sector under technology and policy uncertainty using MARKAL , 2010 .

[25]  Max Henrion,et al.  Uncertainty: A Guide to Dealing with Uncertainty in Quantitative Risk and Policy Analysis , 1990 .

[26]  G. Sinden Characteristics of the UK wind resource: Long-term patterns and relationship to electricity demand , 2007 .

[27]  Zhao Yang Dong,et al.  Flexible Transmission Expansion Planning With Uncertainties in an Electricity Market , 2009, IEEE Transactions on Power Systems.

[28]  Ronnie Belmans,et al.  Integrating short-term demand response into long-term investment planning , 2011 .

[29]  Simon French,et al.  Applied Decision Analysis. , 1985 .

[30]  M. Pollitt Electricity Liberalisation in the European Union: A Progress Report , 2009 .

[31]  A. Conejo,et al.  A Bilevel Approach to Transmission Expansion Planning Within a Market Environment , 2009, IEEE Transactions on Power Systems.

[32]  Antonio Alonso Ayuso,et al.  Introduction to Stochastic Programming , 2009 .