Managing a deteriorating process in a batch production environment
暂无分享,去创建一个
[1] Meir J. Rosenblatt,et al. Simultaneous determination of production cycle and inspection schedules in a production system , 1987 .
[2] Hau L. Lee,et al. Lot Sizing with Random Yields: A Review , 1995, Oper. Res..
[3] Meir J. Rosenblatt,et al. Economic Production Cycles with Imperfect Production Processes , 1986 .
[4] Evan L. Porteus. Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..
[5] Kamran Moinzadeh,et al. Measuring the impact of a delay buffer on quality costs with an unreliable production process , 1995 .
[6] Hau L. Lee,et al. Lot sizing to reduce capacity utilization in a production process with defective items, process corrections, and rework , 1992 .
[7] Evan L. Porteus. Note-The Impact of Inspection Delay on Process and Inspection Lot Sizing , 1990 .