Mathematical Solutions for Solving Periodic Railway Transportation

Train scheduling has been a significant issue in the railway industry. Over the last few years, numerous approaches and tools have been developed to compute railway scheduling. In this paper, we present a set of heuristics for a constraint-based train scheduling tool, which is a project in collaboration with the National Network of Spanish Railways (RENFE), Spain. We formulate train scheduling as constraint optimization problems. Three heuristics are developed to speed up and direct the search toward suboptimal solutions in periodic train scheduling problems. The feasibility of our problem-oriented heuristics is confirmed with experimentation using real-life data. The results show that these techniques enable MIP solvers such as LINGO and ILOG Concert Technology (CPLEX) to terminate earlier with good solutions.

[1]  Paolo Toth,et al.  A Survey of Optimization Models for Train Routing and Scheduling , 1998, Transp. Sci..

[2]  Malachy Carey,et al.  A model and strategy for train pathing with choice of lines, platforms, and routes , 1994 .

[3]  X. Cai,et al.  A fast heuristic for the train scheduling problem , 1994, Comput. Oper. Res..

[4]  M. Wardman THE VALUE OF TRAVEL TIME. A REVIEW OF BRITISH EVIDENCE , 1998 .

[5]  H. Krueger,et al.  Parametric modeling in rail capacity planning , 1999, WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038).

[6]  Christian Liebchen,et al.  Periodic Timetable Optimization in Public Transport , 2006, OR.

[7]  Ali E. Haghani,et al.  Rail freight transportation: A review of recent optimization models for train routing and empty car distribution , 1987 .

[8]  Miguel A. Salido,et al.  An Interactive Train Scheduling Tool for Solving and Plotting Running Maps , 2003, CAEPIA.

[9]  Ho-fung Leung,et al.  A Constraint-Based Interactive Train Rescheduling Tool , 1996, Constraints.

[10]  Erhan Kozan,et al.  Heuristic Techniques for Single Line Train Scheduling , 1997, J. Heuristics.

[11]  Walter Ukovich,et al.  A Mathematical Model for Periodic Scheduling Problems , 1989, SIAM J. Discret. Math..

[12]  Erhan Kozan,et al.  Optimal scheduling of trains on a single line track , 1996 .

[13]  Arjang A. Assad,et al.  MODELS FOR RAIL TRANSPORTATION , 1980 .

[14]  Ismail Sahin,et al.  Railway traffic control and train scheduling based oninter-train conflict management , 1999 .

[15]  Ferenc Szidarovszky,et al.  A multi-objective train scheduling model and solution , 2004 .

[16]  Miguel A. Salido,et al.  An Assessment of Railway Capacity , 2008 .

[17]  L. Ingolotti,et al.  Robustness in railway transportation scheduling , 2008, 2008 7th World Congress on Intelligent Control and Automation.

[18]  Leo G. Kroon,et al.  A Variable Trip Time Model for Cyclic Railway Timetabling , 2003, Transp. Sci..

[19]  Erhan Kozan,et al.  Modelling the number and location of sidings on a single line railway , 1997, Comput. Oper. Res..

[20]  E. A. G. Weits Railway Capacity and Timetable Complexity , 2000 .

[21]  Karl Nachtigall,et al.  A genetic algorithm approach to periodic railway synchronization , 1996, Comput. Oper. Res..