Study on Disassembly Planning of Production System in Reverse Logistics
暂无分享,去创建一个
A critical challenge in remanufacturing of reverse logistics is to seek for a primly production planning method. In some degree, what reverse logistics faces is one kind of indirect need, namely face to need of assembling product component again. Therefore, the disassembly sequence should be made according to the number of different callback productions. In this paper, a disassembly sequence model of callback production is built applied integer plans considering the time, cost and holding cost. The model takes minimum total cost as target function. Then, lead time and cost are controlled through adjusting constraint conditions.
[1] Wolfgang Grimm,et al. Reuse of Electric Motors in Consumer Products , 1998 .
[2] Jacqueline M. Bloemhof-Ruwaard,et al. THE IMPACT OF PRODUCT RECOVERY ON LOGISTICS NETWORK DESIGN , 2001 .
[3] R. Dekker,et al. Modelling product returns in inventory control - exploring the validity or general assumptions , 2001 .
[4] Aart van Harten,et al. Business case Roteb: recovery strategies for monitors , 1999 .
[5] P. Johnson,et al. Managing value in reverse logistics systems , 1998 .