To Pull or Not to Pull: What Is the Question?

The terms pull and lean production have become cornerstones of modern manufacturing practice. However, although they are widely used, they are less widely understood. In this paper, we argue that while the academic literature has steadily revealed the richness of the pull/lean concepts, the practitioner literature has progressively simplified these terms to the point that serious misunderstandings now exist. In hopes of reducing confusion, we offer general, but precise definitions of pull and lean. Specifically, we argue that pull is essentially a mechanism for limiting WIP, and lean is fundamentally about minimizing the cost of buffering variability.

[1]  Hiroyuki Hirano,et al.  JIT Factory Revolution: A Pictorial Guide to Factory Design of the Future , 1989 .

[2]  門田 安弘,et al.  Toyota production system : practical approach to production management , 1983 .

[3]  Kenneth F. Simpson In-Process Inventories , 1958 .

[4]  T.C.E. Cheng,et al.  Just-in-Time Manufacturing: An introduction , 1992 .

[5]  Lee J. Krajewski,et al.  Kanban, MRP, and Shaping the Manufacturing Environment , 1987 .

[6]  Daniel Roos,et al.  The machine that changed the world : the story of lean production , 1991 .

[7]  Sven Axsäter,et al.  Ranking of generalised multi-stage KANBAN policies , 1999, Eur. J. Oper. Res..

[8]  Robert W. Hall,et al.  Driving the productivity machine : production planning and control in Japan : a research report , 1981 .

[9]  James P. Womack,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .

[10]  Y. Monden Toyota Production System: Practical Approach to Production Management , 1983 .

[11]  G. Liberopoulos,et al.  Base stock versus WIP cap in single-stage make-to-stock production–inventory systems , 2002 .

[12]  J. A. Buzacott,et al.  Queueing models of Kanban and MRP controlled production systems , 1989 .

[13]  John A. Buzacott,et al.  Stochastic models of manufacturing systems , 1993 .

[14]  Claudine Chaouiya,et al.  The extended kanban control system for production coordination of assembly manufacturing systems , 2000 .

[15]  P. Glasserman,et al.  Monotone Structure in Discrete Event Systems. , 1995 .

[16]  Phillip S. Mitchell Japanese Manufacturing Techniques: Nine Hidden Lessons in Simplicity , 1983 .

[17]  S. Tayur Structural properties and a heuristic for kanban-controlled serial lines , 1993 .

[18]  Andrew Kusiak,et al.  Overview of Kanban systems , 1996 .

[19]  新郷 重夫,et al.  A revolution in manufacturing : the SMED system , 1985 .

[20]  S. Axsäter,et al.  Installation vs. echelon stock policies for multilevel inventory control , 1993 .

[21]  Michael A. Zazanis,et al.  Push and Pull Production Systems: Issues and Comparisons , 1992, Oper. Res..

[22]  S. S. Panwalkar,et al.  The Lessons of Flowshop Scheduling Research , 1992, Oper. Res..

[23]  Yves Dallery,et al.  Extended kanban control system: combining kanban and base stock , 2000 .

[24]  P. Glasserman,et al.  Monotone Structure in Discrete-Event Systems , 1994 .

[25]  Rajan Suri,et al.  Quick Response Manufacturing , 1998 .

[26]  David L. Woodruff,et al.  CONWIP: a pull alternative to kanban , 1990 .

[27]  W. Whitt,et al.  Open and closed models for networks of queues , 1984, AT&T Bell Laboratories Technical Journal.

[28]  Uday S. Karmarkar Push, Pull and Hybrid Control Schemes , 1991 .

[29]  大野 耐一,et al.  Toyota production system : beyond large-scale production , 1988 .

[30]  Sven Axsäter,et al.  Multi-level production-inventory control: Material requirements planning or reorder point policies? , 1994 .

[31]  Loren Paul Rees,et al.  A SIMULATION ANALYSIS OF THE JAPANESE JUST‐IN‐TIME TECHNIQUE (WITH KANBANS) FOR A MULTILINE, MULTISTAGE PRODUCTION SYSTEM , 1983 .

[32]  Joseph A. Orlicky,et al.  Material Requirements Planning: The New Way of Life in Production and Inventory Management , 1975 .

[33]  Lee J. Krajewski,et al.  Shaping the Manufacturing Environment , 1987 .

[34]  M. Spearman An Analytic Congestion Model for Closed Production Systems with IFR Processing Times , 1991 .

[35]  Hau L. Lee,et al.  The Evolution of Supply-Chain-Management Models and Practice at Hewlett-Packard , 1995 .

[36]  Y. Sugimori,et al.  Toyota production system and Kanban system Materialization of just-in-time and respect-for-human system , 1977 .

[37]  Michael L. George,et al.  Lean Six Sigma : combining Six Sigma quality with lean speed , 2002 .

[38]  Lawrence M. Wein,et al.  Optimal Control of a Two-Station Tandem Production/Inventory System , 1994, Oper. Res..

[39]  Wallace J. Hopp,et al.  Factory physics : foundations of manufacturing management , 1996 .

[40]  Dinah W. Cheng,et al.  Tandem queues with general blocking: A unified model and comparison results , 1993, Discret. Event Dyn. Syst..

[41]  Robert R. Inman,et al.  Inventory is the flower of all evil , 1993 .

[42]  Oliver W. Wight,et al.  MRP II : unlocking America's productivity potential , 1981 .

[43]  Mark L. Spearman,et al.  Customer Service in Pull Production Systems , 1992, Oper. Res..

[44]  Victor R. Prybutok,et al.  The relationship between JIT practices and type of production system , 2001 .

[45]  S. Spear,et al.  Decoding the DNA of the Toyota Production System , 1999 .

[46]  Uday S. Karmarkar,et al.  Batching Policy in Kanban Systems , 1989 .

[47]  Osamu Kimura,et al.  Desiǵn and analysis of Pull System, a method of multi-staǵe production control , 1981 .