Sensitivity Analysis of the Present Value of a Project

[1]  Frederick S. Hillier,et al.  A Basic Model for Capital Budgeting of Risky Interrelated Projects , 1971 .

[2]  John H. K. Kao A Graphical Estimation of Mixed Weibull Parameters in Life-Testing of Electron Tubes , 1959 .

[3]  Richard H. Bernhard,et al.  A Comprehensive Comparison and Critique of Discounting Indices Proposed For Capital Investment Evaluation , 1971 .

[4]  Milton Abramowitz,et al.  Handbook of Mathematical Functions with Formulas, Graphs, and Mathematical Tables , 1964 .

[5]  A. S. Manne CAPACITY EXPANSION AND PROBABILISTIC GROWTH , 1961 .

[6]  H. Weingartner Capital Budgeting of Interrelated Projects: Survey and Synthesis , 1966 .

[7]  T. Teichmann,et al.  Operational Methods for Linear Systems , 1963, The Mathematical Gazette.

[8]  H. L. Beenhakker Discounting Indices Proposed for Capital Investment Evaluation: A Further Examination , 1973 .

[9]  Charles D. Hodgman,et al.  CRC Standard Mathematical Tables , 1959 .

[10]  E. L. Grant Principles of engineering economy , 1930 .

[11]  F. Hillier THE DERIVATION OF PROBABILISTIC INFORMATION FOR THE EVALUATION OF RISKY INVESTMENTS , 1963 .

[12]  An Optimal Strategy for Capacity Expansion , 1972 .

[13]  G. J. Hahn,et al.  Statistical models in engineering , 1967 .

[14]  Fred Hanssmann Operations research techniques for capital investment , 1968 .

[15]  Vernon L. Smith,et al.  Investment and production , 1961 .

[16]  Paul L. Meyer,et al.  Introductory Probability and Statistical Applications , 1970 .

[17]  R. F. Byrne,et al.  Studies in budgeting , 1971 .