A multi-contract net protocol for dynamic scheduling in flexible manufacturing systems (FMS)
暂无分享,去创建一个
Djamila Ouelhadj | Chihab Hanachi | Adlene Moualek | A. Farhi | C. Hanachi | A. Farhi | D. Ouelhadj | Adlene Moualek
[1] Bernard Sauve,et al. An expert system for scheduling in a flexible manufacturing system , 1987 .
[2] Djamila Ouelhadj,et al. Multi-agent system for dynamic scheduling and control in manufacturing cells , 1998, Proceedings. 1998 IEEE International Conference on Robotics and Automation (Cat. No.98CH36146).
[3] Reid G. Smith,et al. The Contract Net Protocol: High-Level Communication and Control in a Distributed Problem Solver , 1980, IEEE Transactions on Computers.
[4] Christopher O'Brien,et al. Cell control research : current status and development trends , 1995 .
[5] Abdelhakim Artiba,et al. An architecture of a multi-model system for planning and scheduling , 1997 .
[6] Henri Pierreval,et al. Une approche multi agents pour l'ordonnancement dynamique d'un système de production flexible , 1996 .
[7] K. Ghedira,et al. How To Schedule A Flow Shop Plant By Agents , 1970 .
[8] Berthe Y. Choueiry,et al. DISA: A Distributed scheduler using abstractions , 1997 .
[9] Randall Steeb,et al. Strategies of Cooperation in Distributed Problem Solving , 1983, IJCAI.
[10] Elizabeth Marie Ehlers,et al. An object-oriented manufacturing scheduling approach , 1996, IEEE Trans. Syst. Man Cybern. Part A.
[11] Monte Zweben,et al. Scheduling and rescheduling with iterative repair , 1993, IEEE Trans. Syst. Man Cybern..
[12] Carlos Ramos,et al. An architecture and a negotiation protocol for the dynamic scheduling of manufacturing systems , 1994, Proceedings of the 1994 IEEE International Conference on Robotics and Automation.