Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop
暂无分享,去创建一个
T. C. Edwin Cheng | Ceyda Oguz | Yu-Fai Fung | Muhammet Fikret Ercan | M. F. Ercan | T. Cheng | C. Oğuz | Y. Fung
[1] Christos Koulamas,et al. A new constructive heuristic for the flowshop scheduling problem , 1998, Eur. J. Oper. Res..
[2] Mohamed Haouari,et al. Heuristic algorithms for the two-stage hybrid flowshop problem , 1997, Oper. Res. Lett..
[3] George L. Vairaktarakis,et al. Minimizing makespan in hybrid flowshops , 1994, Oper. Res. Lett..
[4] Chris N. Potts,et al. Scheduling a two-stage hybrid flow shop with parallel machines at the first stage , 1997, Ann. Oper. Res..
[5] Peter Brucker,et al. Scheduling Algorithms , 1995 .
[6] Jacek Blazewicz,et al. Scheduling Multiprocessor Tasks to Minimize Schedule Length , 1986, IEEE Transactions on Computers.
[7] Bo Chen. Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One Stage , 1995 .
[8] Joseph Y.-T. Leung,et al. Complexity of Scheduling Parallel Task Systems , 1989, SIAM J. Discret. Math..
[9] Ceyda Oguz,et al. Hybrid flow-shop scheduling problems with multiprocessor task systems , 2004, Eur. J. Oper. Res..
[10] Michael Pinedo,et al. Current trends in deterministic scheduling , 1997, Ann. Oper. Res..
[11] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[12] Ceyda Oguz,et al. Scheduling multiprocessor tasks in a two-stage flow-shop environment , 1997 .
[13] Marco Ferretti,et al. Pyramidal Architectures for Computer Vision , 1994, Advances in Computer Vision and Machine Intelligence.
[14] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[15] Peter Brucker,et al. Shop scheduling problems with multiprocessor tasks on dedicated processors , 1995, Ann. Oper. Res..
[16] Jatinder N. D. Gupta,et al. Two-Stage, Hybrid Flowshop Scheduling Problem , 1988 .
[17] Abdelhakim Artiba,et al. A hybrid three-stage flowshop problem: Efficient heuristics to minimize makespan , 1998, Eur. J. Oper. Res..
[18] Maciej Drozdowski,et al. Scheduling multiprocessor tasks -- An overview , 1996 .
[19] Errol L. Lloyd,et al. Concurrent Task Systems , 1981, Oper. Res..
[20] Yu-Fai Fung,et al. Real-time image interpretation on a multi-layer architecture , 1999, Proceedings of IEEE. IEEE Region 10 Conference. TENCON 99. 'Multimedia Technology for Asia-Pacific Information Infrastructure' (Cat. No.99CH37030).