An Effective Artificial Bee Colony Algorithm for a Real-World Hybrid Flowshop Problem in Steelmaking Process
暂无分享,去创建一个
Quan-Ke Pan | Kun Mao | Min Zhang | Ling Wang | Jin-Hui Zhao | Min Zhang | Ling Wang | Q. Pan | K. Mao | Jinlong Zhao | Jin-Hui Zhao
[1] Renjie He,et al. A Novel Artificial Bee Colony Algorithm , 2014, 2014 Sixth International Conference on Intelligent Human-Machine Systems and Cybernetics.
[2] Arezoo Atighehchian,et al. A novel hybrid algorithm for scheduling steel-making continuous casting production , 2009, Comput. Oper. Res..
[3] Rubén Ruiz,et al. The hybrid flow shop scheduling problem , 2010, Eur. J. Oper. Res..
[4] D. Chaudhuri,et al. A multi-stage parallel-processor flowshop problem with minimum flowtime , 1992 .
[5] Rubén Ruiz,et al. A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility , 2006, European Journal of Operational Research.
[6] Xianpeng Wang,et al. A Scatter Search Algorithm for a Multistage Production Scheduling Problem With Blocking and Semi-Continuous Batching Machine , 2011, IEEE Transactions on Control Systems Technology.
[7] Xiaoping Li,et al. An Effective Meta-Heuristic for No-Wait Job Shops to Minimize Makespan , 2012, IEEE Transactions on Automation Science and Engineering.
[8] Rubén Ruiz,et al. Modeling realistic hybrid flexible flowshop scheduling problems , 2008, Comput. Oper. Res..
[9] Rubén Ruiz,et al. Genetic algorithms with different representation schemes for complex hybrid flexible flow line problems , 2010, Int. J. Metaheuristics.
[10] I. Osman,et al. Simulated annealing for permutation flow-shop scheduling , 1989 .
[11] Jiyin Liu,et al. Addressing the gap in scheduling research: a review of optimization and heuristic methods in production scheduling , 1993 .
[12] Jean-Charles Billaut,et al. Production , Manufacturing and Logistics A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation , 2004 .
[13] Dervis Karaboga,et al. AN IDEA BASED ON HONEY BEE SWARM FOR NUMERICAL OPTIMIZATION , 2005 .
[14] Lixin Tang,et al. A review of planning and scheduling systems and methods for integrated steel production , 2001, Eur. J. Oper. Res..
[15] Ling Wang,et al. A Hybrid Quantum-Inspired Genetic Algorithm for Multiobjective Flow Shop Scheduling , 2007, IEEE Transactions on Systems, Man, and Cybernetics, Part B (Cybernetics).
[16] Michael Pinedo,et al. BPSS: A Scheduling Support System for the Packaging Industry , 1993, Oper. Res..
[17] Xianpeng Wang,et al. Color-Coating Production Scheduling for Coils in Inventory in Steel Industry , 2008, IEEE Transactions on Automation Science and Engineering.
[18] Lixin Tang,et al. A mathematical programming model for scheduling steelmaking-continuous casting production , 2000, Eur. J. Oper. Res..
[19] Masayuki Numao,et al. Cooperative scheduling and its application to steelmaking processes , 1991 .
[20] Nhu Binh Ho,et al. Solving Multiple-Objective Flexible Job Shop Problems by Evolution and Local Search , 2008, IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and Reviews).
[21] D. Karaboga,et al. On the performance of artificial bee colony (ABC) algorithm , 2008, Appl. Soft Comput..
[22] Lixin Tang,et al. A mathematical programming model and solution for scheduling production orders in Shanghai Baoshan Iron and Steel Complex , 2007, Eur. J. Oper. Res..
[23] Peter B. Luh,et al. Scheduling of steel-making and continuous casting system using the surrogate subgradient algorithm for lagrangian relaxation , 2010, 2010 IEEE International Conference on Automation Science and Engineering.
[24] Michael Pinedo,et al. PRACTICE‐FOCUSED RESEARCH ISSUES FOR SCHEDULING SYSTEMS* , 2002 .
[25] Hanif D. Sherali,et al. Models and algorithms for a two-stage production process , 1990 .
[26] Kagan Gokbayrak,et al. Constrained Optimal Hybrid Control of a Flow Shop System , 2007, IEEE Transactions on Automatic Control.
[27] Thomas Stützle,et al. Shifting representation search for hybrid flexible flowline problems , 2010, Eur. J. Oper. Res..
[28] Hua Xuan,et al. Scheduling a hybrid flowshop with batch production at the last stage , 2007, Comput. Oper. Res..
[29] Milind Dawande,et al. The Surplus Inventory Matching Problem in the Process Industry , 2000, Oper. Res..
[30] Dervis Karaboga,et al. A powerful and efficient algorithm for numerical function optimization: artificial bee colony (ABC) algorithm , 2007, J. Glob. Optim..
[31] Peter I. Cowling,et al. Integration of continuous caster and hot strip mill planning for steel production , 2000 .
[32] Mehmet Fatih Tasgetiren,et al. A discrete artificial bee colony algorithm for the lot-streaming flow shop scheduling problem , 2011, Inf. Sci..
[33] S. S. Panwalkar,et al. The Lessons of Flowshop Scheduling Research , 1992, Oper. Res..
[34] Nurhan Karaboga,et al. A new design method based on artificial bee colony algorithm for digital IIR filters , 2009, J. Frankl. Inst..
[35] Ping Chen,et al. An iterated local search algorithm for the permutation flowshop problem with total flowtime criterion , 2009, Comput. Oper. Res..
[36] Thomas Stützle,et al. A review of metrics on permutations for search landscape analysis , 2007, Comput. Oper. Res..
[37] Jose M. Framiñan,et al. Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective , 2010, Comput. Oper. Res..
[38] Lin-Yu Tseng,et al. A hybrid genetic local search algorithm for the permutation flowshop scheduling problem , 2009, Eur. J. Oper. Res..
[39] Jan Olhager,et al. Operations research techniques in manufacturing planning and control systems , 1995 .
[40] M. Solomon,et al. Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time , 1996 .
[41] Mostafa Zandieh,et al. Algorithms for a realistic variant of flowshop scheduling , 2010, Comput. Oper. Res..
[42] Rubén Ruiz,et al. TWO NEW ROBUST GENETIC ALGORITHMS FOR THE FLOWSHOP SCHEDULING PROBLEM , 2006 .
[43] Carlos Andrés,et al. Group technology in a hybrid flowshop environment: A case study , 2005, Eur. J. Oper. Res..
[44] Peter B. Luh,et al. Steel-making process scheduling using Lagrangian relaxation , 2002 .
[45] Mostafa Zandieh,et al. An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness , 2009, Expert Syst. Appl..
[46] É. Taillard. Some efficient heuristic methods for the flow shop sequencing problem , 1990 .
[47] Mehmet Fatih Tasgetiren,et al. A discrete artificial bee colony algorithm for the total flowtime minimization in permutation flow shops , 2011, Inf. Sci..
[48] Soo Y. Chang,et al. A lot grouping algorithm for a continuous slab caster in an integrated steel mill , 2000 .
[49] Dervis Karaboga,et al. A comparative study of Artificial Bee Colony algorithm , 2009, Appl. Math. Comput..
[50] A. Guinet,et al. Textile Production Systems: a Succession of Non-identical Parallel Processor Shops , 1991 .
[51] Zhihong Jin,et al. Metaheuristic algorithms for the multistage hybrid flowshop scheduling problem , 2006 .
[52] Guoqing Wang,et al. Parallel machine earliness and tardiness scheduling with proportional weights , 2003, Comput. Oper. Res..
[53] Hubert Missbauer,et al. A scheduling system for the steelmaking-continuous casting process. A case study from the steel-making industry , 2009 .
[54] Leyuan Shi,et al. IEEE Transactions on Automation Science and Engineering , 2009, IEEE Transactions on Automation Science and Engineering.
[55] David E. Goldberg,et al. Genetic Algorithms in Search Optimization and Machine Learning , 1988 .