Construction Automation and Robotics—Pathway to Implementation
暂无分享,去创建一个
Walter W. Boles | Tom Yarborough | Donald A. Maxwell | Wesley D. Scott | Philip D. Heermann | Jon Underwood
[1] Daniel W. Halpin,et al. Potential Robotics Utilization in Construction , 1989 .
[2] Tetsuya Kikuchi,et al. Study of a New 3-D Measuring Method for Diaphragm Walls , 1993 .
[3] E. Boyer. Scholarship Reconsidered: Priorities of the Professoriate , 1990 .
[4] M. Kilger,et al. Video-based traffic monitoring , 1992 .
[5] Rahim F Benekohal,et al. EVALUATION OF FLAGGER TRAINING SESSION ON SPEED CONTROL IN RURAL INTERSTATE CONSTRUCTION ZONES , 1991 .
[6] Miroslaw J. Skibniewski,et al. Automation and Robotics for Road Construction and Maintenance , 1990 .
[7] Richard L. Tucker. Perfection of the Buggy Whip , 1988 .
[8] J D Arnoult. Culvert inspection manual; supplement to the bridge inspector's training manual , 1986 .
[9] R. S. Davis,et al. Remote visual inspection in the nuclear, pipeline, and underwater industries , 1990 .
[10] Boyd C. Paulson,et al. Automation and robotics for construction , 1985 .
[11] Olga J. Pendleton,et al. SPEED CONTROL THROUGH FREEWAY WORK ZONES: TECHNIQUES EVALUATION , 1988 .