A sequencing problem to level part usage rates and work loads for a mixed-model assembly line with a bypass subline
暂无分享,去创建一个
[1] Katsuhisa Ohno,et al. A sequencing problem for a mixed-model assembly line in a JIT production system , 1994 .
[2] George Steiner,et al. A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems , 1990 .
[3] Joaquín Bautista,et al. Heuristics and exact algorithms for solving the Monden problem , 1996 .
[4] R. R. Inman,et al. Sequencing JIT mixed-model assembly lines , 1991 .
[5] Yasuhiro Monden,et al. Toyota Production System: An Integrated Approach to Just-In-Time , 1993 .
[6] W. Kubiak. Minimizing variation of production rates in just-in-time systems: A survey☆ , 1993 .
[7] L. Tsai. Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage , 1995 .
[8] Avraham Shtub,et al. An analytic framework for sequencing mixed model assembly lines , 1992 .
[9] Fred Glover,et al. Tabu Search - Part II , 1989, INFORMS J. Comput..
[10] Ezey M. Dar-El,et al. Assembly line sequencing for model mix , 1975 .