Simultaneous planning of the project scheduling and material procurement problem under the presence of multiple suppliers
暂无分享,去创建一个
[1] Fang Fu. Integrated scheduling and batch ordering for construction project , 2014 .
[2] Erik Demeulemeester,et al. Resource-constrained project scheduling: A survey of recent developments , 1998, Comput. Oper. Res..
[3] Shangyao Yan,et al. A generalized network flow model for the multi-mode resource-constrained project scheduling problem with discounted cash flows , 2015 .
[4] Margaret J. Robertson,et al. Design and Analysis of Experiments , 2006, Handbook of statistics.
[5] Atanu Chaudhuri,et al. Procurement scheduling for complex projects with fuzzy activity durations and lead times , 2014, Comput. Ind. Eng..
[6] Christian Artigues,et al. Resource-Constrained Project Scheduling , 2008 .
[7] Lay Eng Teoh,et al. A bi-objective optimization approach for exclusive bus lane selection and scheduling design , 2014 .
[8] Amir Abbas Najafi,et al. Scheduling a Project to Minimize Costs of Material Requirements , 2011 .
[9] Dwight E. Smith-Daniels,et al. Constrained resource project scheduling subject to material constraints , 1984 .
[10] Rubén Ruiz,et al. A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility , 2006, European Journal of Operational Research.
[11] Dwight E. Smith-Daniels,et al. Optimal Project Scheduling with Materials Ordering , 1987 .
[12] Kap Hwan Kim,et al. Scheduling operations of a rail crane and container deliveries between rail and port terminals , 2011 .
[13] Shengyao Wang,et al. An effective shuffled frog-leaping algorithm for solving the hybrid flow-shop scheduling problem with identical parallel machines , 2013 .
[14] Erik Demeulemeester,et al. Project scheduling : a research handbook , 2002 .
[15] Mustafa Kumral,et al. Robust stochastic mine production scheduling , 2010 .
[16] Shu-Shun Liu,et al. Resource-constrained construction project scheduling model for profit maximization considering cash flow , 2008 .
[17] M Sheykh Sajadieh,et al. CONCURRENT PROJECT SCHEDULING AND MATERIAL PLANNING: A GENETIC ALGORITHM APPROACH , 2009 .
[18] Rolf H. Möhring,et al. Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..
[19] Pierre Hansen,et al. Variable Neighborhood Search , 2018, Handbook of Heuristics.
[20] Karen A. F. Copeland. Design and Analysis of Experiments, 5th Ed. , 2001 .
[21] N. J. Aquilano,et al. A formal set of algorithms for project scheduling with critical path scheduling/material requirements planning , 1980 .
[22] Abbas Afshar,et al. Fuzzy multi-objective optimization of finance-based scheduling for construction projects with uncertainties in cost , 2009 .
[23] A Ehrlich. Scheduling update. , 1983, Dental economics - oral hygiene.
[24] Ling Wang,et al. An effective hybrid immune algorithm for solving the distributed permutation flow-shop scheduling problem , 2014 .
[25] B. DOD1N,et al. Integrated project scheduling and material planning with variable activity duration and rewards , 2001 .
[26] Ikou Kaku,et al. Variable neighbourhood simulated annealing algorithm for capacitated vehicle routing problems , 2014 .
[27] José Ignacio Peláez,et al. Design and optimization of symmetric laminated composites using a variable neighbourhood search-based model , 2012 .
[28] Brian Shorrock,et al. Material Requirements Planning , 1978 .
[29] A Erbasi,et al. A modified heuristic procedure for materials management in project networks , 1999 .
[30] A. A. Elimam,et al. Integrated Project Scheduling and Material Planning with Variable Activity Duration and Rewards , 1996 .
[31] Thomas G. Schmitt,et al. Scheduling recurrent construction , 2004 .
[32] Rainer Kolisch,et al. Experimental investigation of heuristics for resource-constrained project scheduling: An update , 2006, Eur. J. Oper. Res..