Scheduling Imperfect Preventive and Overhaul Maintenance
暂无分享,去创建一个
[1] Loon Ching Tang,et al. A maintenance model for repairable systems , 1989 .
[2] Toshio Nakagawa,et al. Optimum Policies When Preventive Maintenance is Imperfect , 1979, IEEE Transactions on Reliability.
[3] E. Muth. An Optimal Decision Rule for Repair vs Replacement , 1977, IEEE Transactions on Reliability.
[4] Mazhar Ali Khan Malik,et al. Reliable Preventive Maintenance Scheduling , 1979 .
[5] Frank Beichelt,et al. General Failure Model Applied to Preventive Maintenance Policies , 1980, IEEE Transactions on Reliability.
[6] Kyung S. Park. Optimal Number of Minimal Repairs before Replacement , 1979, IEEE Transactions on Reliability.
[7] C.L. Hwang,et al. Optimal Scheduled-Maintenance Policy Based on Multiple-Criteria Decision-Making , 1979, IEEE Transactions on Reliability.
[8] Young Ho Chun,et al. An Algorithm for Preventive Maintenance Policy , 1986, IEEE Transactions on Reliability.
[9] R. Barlow,et al. Optimum Preventive Maintenance Policies , 1960 .