Multiple forecasts with autoregressive time series models: case studies

It is indisputable that accurate forecasts of economic activities are vital to successful business and government policies. In many circumstances, instead of a single forecast, simultaneous prediction intervals for multiple forecasts are more useful to decision-makers. For example, based on previous monthly sales records, a production manager would be interested in the next 12 interval forecasts of the monthly sales using for the annual inventory and manpower planning. For Gaussian autoregressive time series processes, several procedures for constructing simultaneous prediction intervals have been proposed in the literature. These methods assume a normal error distribution and can be adversely affected by departures from normality which are commonly encountered in business and economic time series. In this article, we explore the bootstrap methods for the construction of simultaneous multiple interval forecasts. To understand the mechanisms and characteristics of the proposed bootstrap procedures, several macro-economic time series are selected for illustrative purposes. The selected series are fitted reasonably well with autoregressive models which form an important class in time series. As a matter of fact, the major ideas discussed in this paper with autoregressive processes can be extended to other more complicated time series models.

[1]  Chris Chatfield,et al.  Calculating Interval Forecasts , 1993 .

[2]  Matteo Grigoletto,et al.  Bootstrap prediction intervals for autoregressions: some alternatives , 1998 .

[3]  Guido Masarotto,et al.  Bootstrap prediction intervals for autoregressions , 1990 .

[4]  D. Freedman,et al.  Using the bootstrap to evaluate forecasting equations , 1985 .

[5]  Lori A. Thombs,et al.  Bootstrap Prediction Intervals for Autoregression , 1990 .

[6]  Nalini Ravishanker,et al.  Approximate simultaneous prediction intervals for multiple forecasts , 1987 .

[7]  Michael P. Clements,et al.  Bootstrapping prediction intervals for autoregressive models , 2001 .

[8]  Siu Hung Cheung,et al.  Simultaneous prediction intervals for autoregressive-integrated moving-average models: a comparative study , 1998 .

[9]  Alice Allen Ray SAS/ETS user's guide , 1982 .

[10]  R. J. Bhansali,et al.  Asymptotic Mean-square Error of Predicting more than One-step ahead Using the Regression Method , 1974 .

[11]  G. S. Hongyi Li,et al.  Bootstrapping time series models , 1996 .

[12]  Nalini Ravishanker,et al.  Multiple prediction intervals for time series: Comparison of simultaneous and marginal intervals , 1991 .

[13]  N. Ravishanker,et al.  Simultaneous prediction intervals for multiple forecasts based on Bonferroni and product-type inequalities , 1991 .

[14]  Wenceslao González-Manteiga,et al.  Saving computer time in constructing consistent bootstrap prediction intervals for autoregressive processes , 1997 .

[15]  Juan Romo,et al.  Effects of parameter estimation on prediction densities: a bootstrap approach , 1999 .

[16]  George E. P. Box,et al.  Time Series Analysis: Forecasting and Control , 1977 .

[17]  Gwilym M. Jenkins,et al.  Time series analysis, forecasting and control , 1971 .