An expectancy-equity model of productive system performance
暂无分享,去创建一个
[1] L. Sprague. Needed Research in Organizational Behavior: A Production/Operations Management Perspective , 1977 .
[2] Everett Ernest Adam. An experimental analysis of the change in performance quantity and quality on a routine, repetitive task , 1970 .
[3] Gary P. Latham,et al. The "practical significance" of Locke's theory of goal setting. , 1975 .
[4] J. Garrett,et al. The Protestant Ethic Scale as a predictor of repetitive work performance. , 1975, The Journal of applied psychology.
[5] Edward E. Lawler,et al. Motivation in Work Organizations , 1975 .
[6] Ivars Avots. Why Does Project Management Fail? , 1969 .
[7] Laurie A. Broedling,et al. Relationship of internal-external control to work motivation and performance in an expectancy model. , 1975 .
[8] J. M. Lockhart,et al. Effect of rate and level of lowered finger surface temperature on manual performance. , 1975, The Journal of applied psychology.
[9] E. Adam,et al. The Application of Behavioral Conditioning Procedures to the Problems of Quality Control , 1971 .
[10] E. Lawler,et al. Effects of inequity produced by underpayment on work output, work quality, and attitudes toward the work. , 1967, The Journal of applied psychology.
[11] J. S. Adams,et al. EFFECTS OF WAGE INEQUITIES ON WORK QUALITY. , 1964, Journal of abnormal psychology.
[12] P. Fitts. Cognitive aspects of information processing. 3. Set for speed versus accuracy. , 1966, Journal of experimental psychology.
[13] Effect of external reward on conformity and accuracy responses in a group pressure situation. , 1965 .
[14] E. Lawler,et al. Inequity reduction over time in an induced overpayment situation , 1968 .
[15] Theodorus Leonardus Stok. The worker and quality control , 1965 .
[16] E. Lawler,et al. Employee reactions to a pay incentive plan. , 1973 .
[17] S. DAVID M. KING,et al. Productivity and Social Organization , 1958, Nature.
[18] E. T. Klemmer,et al. Productivity and errors in two keying tasks: A field study. , 1962 .
[19] Lyman W. Porter,et al. The role of task-goal attributes in employee performance. , 1974 .
[20] V. Catano. Relation of Improved Performance through Verbal Praise to Source of Praise , 1975 .
[21] E. A. Fleishman,et al. Evaluation of an abilities classification system for integrating and generalizing human performance research findings: An application to vigilance tasks. , 1973 .
[22] G. S. Snoddy. Learning and stability: a psychophysiological analysis of a case of motor learning with clinical applications. , 1926 .
[23] Mark S. Sanders,et al. Human Factors in Engineering and Design , 1957 .
[24] B. L. Foote,et al. The Effect of Inspector Accuracy on the Type I and Type II Errors of Common Sampling Techniques , 1975 .
[25] Edward E. Lawler,et al. Pay and organizational effectiveness : a psychological view , 1972 .
[26] L. L. Cummings. Needed Research in Production/Operations Management: A Behavioral Perspective , 1977 .
[27] J. Hackman,et al. Employee reactions to job characteristics. , 1971 .
[28] Joan C. Woodward. Management and technology , 1958 .
[29] J. F. Mackworth. PERFORMANCE DECREMENT IN VIGILANCE, THRESHOLD, AND HIGH-SPEED PERCEPTUAL MOTOR TASKS. , 1964, Canadian journal of psychology.
[30] P. Lawrence,et al. Organization and environment , 1967 .
[31] E. Adam. An analysis of changes in performance quality with operant conditioning procedures. , 1972 .
[32] Kenneth E. Case,et al. The Effect of Inspection Error on Average Outgoing Quality , 1975 .