Human cognitive analysis of disassembly planning using fuzzy petri nets

Disassembly, as the process of systematic removal of desirable constituent parts from an assembly, is of growing importance due to the increasing environmental and economic pressures. Designing and improving disassembly process towards a more economic manner is worthwhile investigating. This paper extends our previous work on human factors in disassembly. More specifically, a Fuzzy Petri Net (FPN) is proposed to mathematically model uncertainties in the disassembly process due to the variations in operator skill level and product condition. An adaptive fuzzy system is further developed for the decision-making in disassembly process planning (DPP), where a learning mechanism is engaged to monitor the quality of various parameter estimates and exploit the past “knowledge” regarding uncertainties. This idea is exemplified through the disassembly of a discarded product with three components.

[1]  Rahul Rai,et al.  A Petri Net based approach to determine the disassembly strategy of a product , 2002 .

[2]  MengChu Zhou,et al.  Fuzzy reasoning Petri nets , 2003, IEEE Trans. Syst. Man Cybern. Part A.

[3]  Surendra M. Gupta,et al.  Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships , 2001, Eur. J. Oper. Res..

[4]  MengChu Zhou,et al.  Design and implementation of an adaptive process planner for disassembly processes , 2000, IEEE Trans. Robotics Autom..

[5]  T. Ross Fuzzy Logic with Engineering Applications , 1994 .

[6]  MengChu Zhou,et al.  Fuzzy-Petri-net-based disassembly planning considering human factors , 2006, IEEE Trans. Syst. Man Cybern. Part A.

[7]  Ajd Fred Lambert,et al.  Disassembly sequencing: A survey , 2003 .

[8]  MengChu Zhou,et al.  Disassembly modeling, planning, and application , 2002 .

[9]  Jong-Oh Park,et al.  Optimal Disassembly Sequence Using Genetic Algorithms Considering Economic and Environmental Aspects , 2001 .

[10]  Lin,et al.  Optimal operation planning using fuzzy Petri nets with resource constraints , 2002, Int. J. Comput. Integr. Manuf..

[11]  Surendra M. Gupta,et al.  Disassembly sequence plan generation using a branch-and-bound algorithm , 2001 .

[12]  A. Lambert Determining optimum disassembly sequences in electronic equipment , 2002 .

[13]  Steven J Skerlos,et al.  Multi-criteria decision-making for optimization of product disassembly under multiple situations. , 2003, Environmental science & technology.

[14]  MengChu Zhou,et al.  An integrated approach to disassembly planning and demanufacturing operation , 2001, IEEE Trans. Robotics Autom..

[15]  Jin-Fu Chang,et al.  Knowledge Representation Using Fuzzy Petri Nets , 1990, IEEE Trans. Knowl. Data Eng..

[16]  A. Sanderson,et al.  Task sequence planning using fuzzy Petri nets , 1991, Conference Proceedings 1991 IEEE International Conference on Systems, Man, and Cybernetics.