Modeling and worker motivation in JIT production systems

This paper concerns the modeling of low inventory lines. Currently, most models assume that processing times are independent. We consider the differences in behavior of workers in low- and high-inventory production lines. Using a laboratory experiment we show that workers speed up when they are the cause of idle time on the line. This means that processing time distributions are not independent of the size of the buffer, of the processing speed of co-workers, or of the amount of inventory in the system. We show that the direction of these effects is predictable and that the magnitude is significant. In particular, there is less idle time and higher output than would be predicted using assumptions of independence. In this experiment the effect completel y canceled productivity loss due to blocking and starving. This work is important in understanding both the motivation of workers in low-inventory systems and the implications of models of manufacturing flow lines.

[1]  R. Schonberger Japanese manufacturing techniques : nine hidden lessons simplicity , 1982 .

[2]  Noel M. Tichy,et al.  Managing strategic change , 1983 .

[3]  N. Tichy Managing strategic change: Technical, political, and cultural dynamics , 1985 .

[4]  D. Wells,et al.  Choosing Sides: Unions and the Team Concept , 1988 .

[5]  William L. Maxwell,et al.  The Role of Work-in-Process Inventory in Serial Production Lines , 1988, Oper. Res..

[6]  A. Tellegen,et al.  PERSONALITY PROCESSES AND INDIVIDUAL DIFFERENCES An Alternative "Description of Personality": The Big-Five Factor Structure , 2022 .

[7]  Karen A. Brown,et al.  A Comparison of Just-in-Time and Batch Manufacturing: The Role of Performance Obstacles , 1991 .

[8]  Karen A. Brown,et al.  Human resource issues in cellular manufacturing: A sociotechnical analysis , 1991 .

[9]  Barry Wilkinson,et al.  Pushing back the frontiers: management control and work intensification under JIT/TQM factory regimes , 1992 .

[10]  G. Sewell,et al.  `Someone to Watch Over Me': Surveillance, Discipline and the Just-in-Time Labour Process , 1992 .

[11]  S. Snell,et al.  Integrated Manufacturing and Human Resource Management: A Human Capital Perspective , 1992 .

[12]  Yves Dallery,et al.  Manufacturing flow line systems: a review of models and analytical results , 1992, Queueing Syst. Theory Appl..

[13]  David F. Groebner,et al.  The Impact of Implementing JIT on Employees′ Job Attitudes , 1994 .

[14]  Timothy A. Judge,et al.  Job satisfaction : how people feel about their jobs and how it affects their performance , 1994 .

[15]  R. R. Abidin Psychological Assessment Resources , 1995 .

[16]  Lawrence W. Robinson,et al.  Using state-dependent processing rates to emulate SPT queue discipline in an FCPS queueing network , 1995 .

[17]  John J. Bartholdi,et al.  Dynamics Of 2- And 3-Worker "Bucket Brigade" Production Lines , 1996 .

[18]  T. D. Klastorin,et al.  Impact of material flow policies and goals on job outcomes , 1996 .

[19]  John W. Boudreau,et al.  The Effects of JIT on the Development of Productivity Norms , 1997 .