Lead time variation control using reliable shipment equipment: An incentive scheme for supply chain coordination

In this paper, service level coordination is studied in a two-stage supply chain (SC). In the investigated model, a retailer is faced with uncertain lead time (LT) due to shipping time instability. Reducing lead time fluctuations is used as an incentive scheme to induce the retailer for participation in the coordination plan. Range of LT fluctuation which is acceptable for both parties is extracted. It is shown that using more reliable shipping equipment as an incentive could coordinate SC. Under some circumstances, the proposed model can increase SC profitability more than centralized decision making model.

[1]  David F. Pyke,et al.  Inventory management and production planning and scheduling , 1998 .

[2]  Jason C. H. Chen,et al.  A bi-objective optimization of supply chain design and distribution operations using non-dominated sorting algorithm: A case study , 2013, Expert Syst. Appl..

[3]  Z. K. Weng,et al.  Channel coordination and quantity discounts , 1995 .

[4]  Jiazhen Huo,et al.  Buyer–vendor inventory coordination with quantity discount incentive for fixed lifetime product , 2010 .

[5]  J C-H Pan,et al.  Inventory models with fixed and variable lead time crash costs considerations , 2002, J. Oper. Res. Soc..

[6]  Liang-Yuh Ouyang,et al.  A note on periodic review inventory model with controllable setup cost and lead time , 2004, Comput. Oper. Res..

[7]  M. Güray Güler,et al.  On coordination under random yield and random demand , 2013, Expert Syst. Appl..

[8]  Yeu-Shiang Huang,et al.  A study on coordination of capacity allocation for different types of contractual retailers , 2013, Decis. Support Syst..

[9]  S. K. Chaharsooghi,et al.  LT variance or LT mean reduction in supply chain management: Which one has a higher impact on SC performance? , 2010 .

[10]  Abdul Raouf,et al.  Inventory Models Involving Lead Time as a Decision Variable , 1994 .

[11]  Chonghui Guo,et al.  Channel coordination and volume discounts with price-sensitive demand , 2007 .

[12]  Jiazhen Huo,et al.  Two level supply chain coordination with delay in payments for fixed lifetime products , 2012, Comput. Ind. Eng..

[13]  Liang-Yuh Ouyang,et al.  Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction , 2006, Eur. J. Oper. Res..

[14]  V. Roshan Joseph,et al.  Estimating and Benchmarking Less-Than-Truckload Market Rates , 2010 .

[15]  Christoph H. Glock,et al.  Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand , 2012 .

[16]  Omkar D. Palsule-Desai Supply chain coordination using revenue-dependent revenue sharing contracts , 2013 .

[17]  Abhijit Deshmukh,et al.  Analysis of supply contracts with quantity flexibility , 2009, Eur. J. Oper. Res..

[18]  Ching-Ter Chang,et al.  A linearization approach for inventory models with variable lead time , 2005 .

[19]  Shu-Lu Hsu,et al.  Replenishment and Lead Time Decisions in Manufacturer-Retailer Chains , 2009 .

[20]  Liang-Yuh Ouyang,et al.  Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process , 2002, Comput. Oper. Res..

[21]  Saoussen Krichen,et al.  Single supplier multiple cooperative retailers inventory model with quantity discount and permissible delay in payments , 2011, Comput. Ind. Eng..

[22]  Subrata Saha,et al.  Supply chain coordination through rebate induced contracts , 2013 .

[23]  Xin James He,et al.  The impact of stochastic lead time reduction on inventory cost under order crossover , 2011, Eur. J. Oper. Res..

[24]  W. K. Wong,et al.  Coordinating supply chains with sales rebate contracts and vendor-managed inventory , 2009 .

[25]  Eleonora Bottani,et al.  Lead time reduction through ICT application in the footwear industry: A case study , 2007 .

[26]  Kin Keung Lai,et al.  Single period stochastic inventory problems with ordering or returns policies , 2011, Comput. Ind. Eng..

[27]  Ismail Serdar Bakal,et al.  Joint quantity flexibility for multiple products in a decentralized supply chain , 2013, Comput. Ind. Eng..

[28]  C. Liao,et al.  An Analytical Determination of Lead Time with Normal Demand , 1991 .

[29]  Jung-Fa Tsai,et al.  An optimization approach for supply chain management models with quantity discount policy , 2007, Eur. J. Oper. Res..

[30]  Harish Krishnan,et al.  On the role of revenue-sharing contracts in supply chains , 2011, Oper. Res. Lett..

[31]  Y. Narahari,et al.  Achieving sharp deliveries in supply chains through variance pool allocation , 2006, Eur. J. Oper. Res..

[32]  Xiaowo Tang,et al.  Competition among supply chains: Implications of full returns policy , 2012 .

[33]  Kripa Shanker,et al.  Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints , 2013 .

[34]  David J. Forkenbrock,et al.  Comparison of external costs of rail and truck freight transportation , 2001 .

[35]  Yeu-Shiang Huang,et al.  A study on lead-time discount coordination for deteriorating products , 2011, Eur. J. Oper. Res..

[36]  J. Proth,et al.  Analysis of a supply chain partnership with revenue sharing , 2005 .

[37]  L. Ouyang,et al.  Mixture Inventory Model with Backorders and Lost Sales for Variable Lead Time , 1996 .

[38]  W. C. Benton,et al.  A classification of literature on determining the lot size under quantity discounts , 1996 .

[39]  Jeff Hoi Yan Yeung,et al.  Supply chain coordination with controllable lead time and asymmetric information , 2012, Eur. J. Oper. Res..

[40]  Jafar Heydari,et al.  Supply chain coordination for the joint determination of order quantity and reorder point using credit option , 2010, Eur. J. Oper. Res..

[41]  Xiaopeng Li,et al.  An integrated modeling framework for design of logistics networks with expedited shipment services , 2013 .

[42]  Siwook Ryu,et al.  A stochastic inventory model of dual sourced supply chain with lead-time reduction , 2003 .

[43]  Arthur F. Veinott,et al.  Analysis of Inventory Systems , 1963 .

[44]  Jing Chen,et al.  Coordinating a decentralized supply chain with customer returns and price-dependent stochastic demand using a buyback policy , 2011, Eur. J. Oper. Res..

[45]  Seyed Reza Hejazi,et al.  Coordinating orders in a two echelon supply chain with controllable lead time and ordering cost using the credit period , 2012, Comput. Ind. Eng..

[46]  Yu-Cheng Hsiao,et al.  Optimal reorder point inventory models with variable lead time and backorder discount considerations , 2004, Eur. J. Oper. Res..

[47]  M. Parlar,et al.  Lead-time reduction in a two-level supply chain : non-cooperative equilibria vs. coordination with a profit-sharing contract , 2009 .

[48]  Satish V. Ukkusuri,et al.  Benefits of in-Vehicle Consolidation in Less than Truckload Freight Transportation Operations , 2013 .