Joint single vendor-single buyer supply chain problem with stochastic demand and fuzzy lead-time

This study solves a chance–constraint supply chain problem with stochastic demand which follows a uniform distribution. Fuzzy delay times (moving, waiting and setup time) are assumed to be lot size dependent and shortage is partially backordered. The buyer is responsible for the costs incurred in ordering, holding, shortage and transportation, while the vendor is responsible for setup and holding costs. The service rate of each product has a chance constraint and the buyer has a budget constraint. Our objective is to determine the re-order point and the order quantity of the products such that the total cost is minimized. Since the problem is uncertain integer–nonlinear, two hybrid procedures of Artificial Bee Colony (ABC) and Particle Swarm Optimization (PSO) with fuzzy simulation and approximate simulation methods are developed to solve the problems. Three numerical case examples are given to demonstrate the applicability of the proposed methodologies in a real world supply chain problem.

[1]  M. Ben-Dayaa,et al.  Integrated single vendor single buyer model with stochastic demand and variable lead time , 2004 .

[2]  Yoshikazu Fukuyama,et al.  Practical distribution state estimation using hybrid particle swarm optimization , 2001, 2001 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.01CH37194).

[3]  D. Karaboga,et al.  On the performance of artificial bee colony (ABC) algorithm , 2008, Appl. Soft Comput..

[4]  P. C. Yang,et al.  Global optimal policy for vendor–buyer integrated inventory system within just in time environment , 2007, J. Glob. Optim..

[5]  Mohamed Ben-Daya,et al.  Some stochastic inventory models with deterministic variable lead time , 1999, Eur. J. Oper. Res..

[6]  Mauro Birattari,et al.  Swarm Intelligence , 2012, Lecture Notes in Computer Science.

[7]  Guy Theraulaz,et al.  Self-Organization in Biological Systems , 2001, Princeton studies in complexity.

[8]  Naoki Hayashi,et al.  Distribution state estimation considering nonlinear characteristics of practical equipment using hybrid particle swarm optimization , 2000, PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409).

[9]  Dusan Teodorovic,et al.  Bee Colony Optimization (BCO) , 2009, Innovations in Swarm Intelligence.

[10]  An Tong,et al.  A Supply Chain Model of Vendor Managed Inventory with Fuzzy Demand , 2010, 2010 International Conference on System Science, Engineering Design and Manufacturing Informatization.

[11]  Roger M. Hill,et al.  The optimal production and shipment policy for the single-vendor singlebuyer integrated production-inventory problem , 1999 .

[12]  M. Rockstein Bees. Their Vision, Chemical Senses, and Language , 1952 .

[13]  Junjie Li,et al.  Structural inverse analysis by hybrid simplex artificial bee colony algorithms , 2009 .

[14]  Manoranjan Maiti,et al.  A single period inventory model with imperfect production and stochastic demand under chance and imprecise constraints , 2008, Eur. J. Oper. Res..

[15]  Ata Allah Taleizadeh,et al.  A particle swarm optimization approach for constraint joint single buyer-single vendor inventory problem with changeable lead time and (r,Q) policy in supply chain , 2010 .

[16]  L. Ouyang,et al.  Mixture Inventory Model with Backorders and Lost Sales for Variable Lead Time , 1996 .

[17]  T. Seeley The Wisdom of the Hive: The Social Physiology of Honey Bee Colonies , 1995 .

[18]  James Kennedy,et al.  Particle swarm optimization , 2002, Proceedings of ICNN'95 - International Conference on Neural Networks.

[19]  J. M. Hsiao,et al.  A buyer-vendor EOQ model with changeable lead-time in supply chain , 2005 .

[20]  Marco Dorigo,et al.  Swarm intelligence: from natural to artificial systems , 1999 .

[21]  M. Hariga,et al.  Integrated single vendor single buyer model with stochastic demand and variable lead time , 2004 .

[22]  Turan Paksoy,et al.  A fuzzy linear programming model for the optimization of multi-stage supply chain networks with triangular and trapezoidal membership functions , 2012, J. Frankl. Inst..

[23]  Mohamed A. El-Sharkawi,et al.  Modern Heuristic Optimization Techniques , 2008 .

[24]  Turan Paksoy,et al.  Swarm intelligence approaches to estimate electricity energy demand in Turkey , 2012, Knowl. Based Syst..

[25]  Kun-Shan Wu A mixed inventory model with variable lead time and random supplier capacity , 2001 .

[26]  C. Kao,et al.  A single-period inventory model with fuzzy demand , 2002 .

[27]  K. Frisch Bees: their vision, chemical senses, and language , 1950 .

[28]  Ahmad Makui,et al.  Multiproduct multiple-buyer single-vendor supply chain problem with stochastic demand, variable lead-time, and multi-chance constraint , 2012, Expert Syst. Appl..

[29]  Zhen Shao,et al.  Fuzzy multi-product constraint newsboy problem , 2006, Appl. Math. Comput..

[30]  A. Banerjee A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .

[31]  Baoding Liu Uncertainty Theory: An Introduction to its Axiomatic Foundations , 2004 .

[32]  Tsu-Pang Hsieh,et al.  A particle swarm optimization for solving joint pricing and lot-sizing problem with fluctuating demand and unit purchasing cost , 2010, Comput. Math. Appl..

[33]  Alok Singh,et al.  An artificial bee colony algorithm for the leaf-constrained minimum spanning tree problem , 2009, Appl. Soft Comput..

[34]  Lin Wang,et al.  Model and algorithm of fuzzy joint replenishment problem under credibility measure on fuzzy goal , 2013, Knowl. Based Syst..

[35]  Yian-Kui Liu,et al.  Expected value of fuzzy variable and fuzzy expected value models , 2002, IEEE Trans. Fuzzy Syst..

[36]  Hiroaki Ishii,et al.  A stochastic inventory problem with fuzzy shortage cost , 1998, Eur. J. Oper. Res..

[37]  Kunhiraman Nair,et al.  Fuzzy models for single-period inventory problem , 2002, Fuzzy Sets Syst..

[38]  D. Pham,et al.  THE BEES ALGORITHM, A NOVEL TOOL FOR COMPLEX OPTIMISATION PROBLEMS , 2006 .

[39]  Arthur F. Veinott,et al.  Analysis of Inventory Systems , 1963 .

[40]  D. Petrovic,et al.  Fuzzy models for the newsboy problem , 1996 .

[41]  Abdul Raouf,et al.  Inventory Models Involving Lead Time as a Decision Variable , 1994 .

[42]  Manoranjan Maiti,et al.  A numerical approach to a multi-objective optimal inventory control problem for deteriorating multi-items under fuzzy inflation and discounting , 2008, Comput. Math. Appl..

[43]  S. Goyal “A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* , 1988 .

[44]  Seyed Reza Hejazi,et al.  Supply chain modeling in uncertain environment with bi-objective approach , 2009, Comput. Ind. Eng..