Modeling the master production scheduling system with downgraded products for a TFT-LCD module factory
暂无分享,去创建一个
[1] James T. Lin,et al. Critical material planning for TFT-LCD production industry , 2009 .
[2] Yon-Chun Chou,et al. A methodology for product mix planning in semiconductor foundry manufacturing , 2000 .
[3] S.-M. Wang,et al. A resource portfolio model for equipment investment and allocation of semiconductor testing industry , 2007, Eur. J. Oper. Res..
[4] Kune-muh Tsai,et al. Multi-site available-to-promise modeling for assemble-to-order manufacturing: An illustration on TFT-LCD manufacturing , 2009 .
[5] Wen Lea Pearn,et al. Analytic network process (ANP) approach for product mix planning in semiconductor fabricator , 2005 .
[6] I-Hsuan Hong,et al. A model for batch available-to-promise in order fulfillment processes for TFT-LCD production chains , 2010, Comput. Ind. Eng..
[7] Shu-Cherng Fang,et al. A shadow-price based heuristic for capacity planning of TFT-LCD manufacturing , 2009 .
[8] Chao-Ton Su,et al. An optimal yield mapping approach for the small and medium sized liquid crystal displays , 2006 .
[9] Bongju Jeong,et al. An assembly scheduler for TFT LCD manufacturing , 2001 .