Integrated public transport timetable synchronization with vehicle scheduling

ABSTRACT In public transport (PT) operations planning, timetable synchronization is a useful strategy to reduce inter-route or inter-modal passenger transfer waiting time and provide a well-connected service. This work addresses the integrated PT timetable synchronization with vehicle scheduling problem for a given PT network. A new bi-objective integer programming model is developed for the problem. The objectives are to maximize the number of simultaneous vehicle arrivals at the transfer nodes of a PT network, and to minimize the required fleet size. A novel two-stage deficit function (DF)-based method is developed to solve the mathematical model using a human–machine interactive approach. At the first stage, some existing optimizers are employed to quickly generate an initial solution. At the second stage, a DF-based graphical optimization technique is utilized to generate alternative Pareto-efficient solutions by reducing the fleet size. Numerical results demonstrate that the proposed model has the potential to be applied for large-scale real-world networks.

[1]  Avishai Ceder,et al.  Public Transit Planning and Operation: Modeling, Practice and Behavior , 2015 .

[2]  Hai Yang,et al.  Multi-objective re-synchronizing of bus timetable: Model, complexity and solution , 2016 .

[3]  Tao Liu,et al.  Synchronizing Public Transport Transfers by Using Intervehicle Communication Scheme , 2014 .

[4]  Yasmin A. Rios-Solis,et al.  An integrated approach for timetabling and vehicle scheduling problems to analyze the trade-off between level of service and operating costs of transit networks , 2014 .

[5]  Allan Larsen,et al.  The Simultaneous Vehicle Scheduling and Passenger Service Problem , 2013, Transp. Sci..

[6]  H. Stern,et al.  DEFICIT FUNCTION BUS SCHEDULING WITH DEADHEADING TRIP INSERTIONS FOR FLEET SIZE REDUCTION , 1981 .

[7]  Jean-Marc Rousseau,et al.  SYNCRO: A Computer-Assisted Tool for the Synchronization of Transfers in Public Transit Networks , 1992 .

[8]  Tao Liu,et al.  Optimal Synchronized Transfers in Schedule-Based Public Transport Networks Using Online Operational Tactics , 2015 .

[9]  S. C. Wirasinghe,et al.  Nearly optimal parameters for a rail/feeder-bus system on a rectangular grid , 1980 .

[10]  Yousef Shafahi,et al.  A practical model for transfer optimization in a transit network: Model formulations and solutions , 2010 .

[11]  Paul Schonfeld,et al.  OPTIMAL SLACK TIME FOR TIMED TRANSFERS AT A TRANSIT TERMINAL , 1991 .

[12]  Janny Leung,et al.  Optimizing Timetable Synchronization for Rail Mass Transit , 2008, Transp. Sci..

[13]  Omar J. Ibarra-Rojas,et al.  Synchronizing different transit lines at common stops considering travel time variability along the day , 2016 .

[14]  Helman I. Stern,et al.  THE VARIABLE TRIP PROCEDURE USED IN THE AUTOBUS VEHICLE SCHEDULER. FROM THE BOOK COMPUTER SCHEDULING OF PUBLIC TRANSPORT 2 , 1985 .

[15]  Boaz Golany,et al.  Creating bus timetables with maximal synchronization , 2001 .

[16]  Tao Liu,et al.  A Note on Transit Coordination Using Integer-Ratio Headways , 2017, IEEE Transactions on Intelligent Transportation Systems.

[17]  V. K. Linis,et al.  On the Problem of Constructing Routes, Part II: Methodology and Numerical Example , 2017 .

[18]  Jin-Kao Hao,et al.  Transit network timetabling and vehicle assignment for regulating authorities , 2010, Comput. Ind. Eng..

[19]  Jin-Kao Hao,et al.  Transit Network Re-timetabling and Vehicle Scheduling , 2008, MCO.

[20]  Matthias H Rapp,et al.  TRANSFER OPTIMIZATION IN AN INTERACTIVE GRAPHIC SYSTEM FOR TRANSIT PLANNING , 1967 .

[21]  Tao Liu,et al.  Communication-Based Cooperative Control Strategy for Public Transport Transfer Synchronization , 2016 .

[22]  James H. Bookbinder,et al.  Transfer Optimization in a Transit Network , 1992, Transp. Sci..

[23]  Avishai Ceder,et al.  Deficit function related to public transport: 50 year retrospective, new developments, and prospects , 2017 .

[24]  Anita Schöbel,et al.  Integrating line planning, timetabling, and vehicle scheduling: a customer-oriented heuristic , 2009, Public Transp..

[25]  Avishai Ceder,et al.  A Robust, Tactic-Based, Real-Time Framework for Public- Transport Transfer Synchronization , 2015 .

[26]  Yasmin A. Rios-Solis,et al.  Synchronization of bus timetabling , 2012 .

[27]  Carlos F. Daganzo,et al.  Coordinating Transit Transfers in Real Time , 2016 .

[28]  Avishai Ceder,et al.  A STEP FUNCTION FOR IMPROVING TRANSIT OPERATIONS PLANNING USING FIXED AND VARIABLE SCHEDULING , 2002 .

[29]  Stefan Voß Network Design Formulations in Schedule Synchronization , 1992 .

[30]  Avishai Ceder,et al.  Optimal coordination of public transit vehicles using operational tactics examined by simulation , 2008 .

[31]  Avishai Ceder,et al.  Transfer Synchronization of Public Transport Networks , 2013 .

[32]  Subeh Chowdhury,et al.  Definition of Planned and Unplanned Transfer of Public Transport Service and User Decisions to Use Routes with Transfers , 2013 .

[33]  C Daganzo,et al.  ON THE COORDINATION OF INBOUND AND OUTBOUND SCHEDULES AT TRANSPORTATION TERMINALS , 1990 .

[34]  Helman Stern,et al.  Minimal Resources for Fixed and Variable Job Schedules , 1978, Oper. Res..

[35]  Wolfgang Domschke,et al.  Schedule synchronization for public transit networks , 1989 .

[36]  Paul Schonfeld,et al.  JOINT OPTIMIZATION OF A RAIL TRANSIT LINE AND ITS FEEDER BUS SYSTEM , 1998 .

[37]  Tao Liu,et al.  Graphical Human–Machine Interactive Approach for Integrated Bus Transit Scheduling: Lessons Gained From a Large Bus Company , 2017, IEEE Transactions on Intelligent Transportation Systems.

[38]  Avishai Ceder,et al.  Public Transit Planning and Operation , 2007 .

[39]  Michael J. Cassidy,et al.  Cost-Saving Properties of Schedule Coordination in a Simple Trunk-and-Feeder Transit System , 2010 .

[40]  Vukan R Vuchic,et al.  Urban Transit : Operations, Planning and Economics , 2005 .

[41]  F. J. M. Salzborn,et al.  Scheduling Bus Systems with Interchanges , 1980 .

[42]  I. Gertsbach,et al.  Constructing an Optimal Fleet for a Transportation Schedule , 1977 .

[43]  Gordon F. Newell,et al.  Optimal Parameters for a Coordinated Rail and Bus Transit System , 1977 .

[44]  Steven I-Jy Chien,et al.  Intermodal Transit System Coordination , 2002 .

[45]  Safia Kedad-Sidhoum,et al.  Valid inequalities for the synchronization bus timetabling problem , 2016, Eur. J. Oper. Res..

[46]  Theo Muller,et al.  Optimized Transfer Opportunities in Public Transport , 1995, Transp. Sci..

[47]  Maged Dessouky,et al.  REAL-TIME CONTROL OF BUSES FOR SCHEDULE COORDINATION AT A TERMINAL , 2003 .