Fuzzy approach for production planning by using a three-dimensional printing-based ubiquitous manufacturing system

Abstract A ubiquitous manufacturing (UM) system is used in manufacturing for obtaining the Internet of things solutions and provides location-based manufacturing services. Human-induced uncertainty and early termination are two complications that hamper the effectiveness of an UM system based on three-dimensional (3D) printing. To resolve these complications, several solutions were considered in this study. First, fuzzy-valued parameters were defined to determine uncertainty. Subsequently, slack was derived to determine whether to restart an early terminated 3D printing process in the same 3D printing facility. Consequently, two optimization models – a fuzzy mixed-integer linear programming model and a fuzzy mixed-integer quadratic programming model – were developed in this study. Based on the two optimization models, a fuzzy 3D printing-based UM system that considers uncertainty and early termination was developed. The effectiveness of the proposed methodology was tested by conducting a regional experiment. The experimental results revealed that the proposed methodology could shorten the average cycle time by 9% and could enable 3D printing facilities to make real-time, online reprinting decisions.

[1]  Tai-Sheng Su,et al.  Fuzzy multi-objective procurement/production planning decision problems for recoverable manufacturing systems , 2015 .

[2]  Toly Chen,et al.  A ubiquitous manufacturing network system , 2017 .

[3]  A. N. Mustafizul Karim,et al.  Managing risk in production scheduling under uncertain disruption , 2015, Artificial Intelligence for Engineering Design, Analysis and Manufacturing.

[4]  Toly Chen A fuzzy mid-term single-fab production planning model , 2003, J. Intell. Manuf..

[5]  Hsi-Mei Hsu,et al.  Possibilistic programming in production planning of assemble-to-order environments , 2001, Fuzzy Sets Syst..

[6]  Toly Chen,et al.  Feasibility Evaluation and Optimization of a Smart Manufacturing System Based on 3D Printing: A Review , 2017, Int. J. Intell. Syst..

[7]  Fernando Jiménez,et al.  A Multi-Objective Evolutionary Approach for Fuzzy Optimization in Production Planning , 2006, 2006 IEEE International Conference on Systems, Man and Cybernetics.

[8]  Toly Chen,et al.  INLP-BPN approach for recommending hotels to a mobile traveler , 2018, J. Ambient Intell. Humaniz. Comput..

[9]  Dazhong Wu,et al.  Digital design and manufacturing on the cloud: A review of software and services—RETRACTED , 2017, Artificial Intelligence for Engineering Design, Analysis and Manufacturing.

[10]  Tin-Chih Toly Chen,et al.  Quality control issues in 3D-printing manufacturing: a review , 2018 .

[11]  Ting Qu,et al.  Agent-based smart objects management system for real-time ubiquitous manufacturing , 2011 .

[12]  Toly Chen,et al.  Strengthening the Competitiveness and Sustainability of a Semiconductor Manufacturer with Cloud Manufacturing , 2014 .

[13]  Fernando Augusto Silva Marins,et al.  A Fuzzy Goal Programming model for solving aggregate production-planning problems under uncertainty: A case study in a Brazilian sugar mill , 2014 .

[14]  Jie Zhang,et al.  Data-driven process planning for shipbuilding , 2017, Artificial Intelligence for Engineering Design, Analysis and Manufacturing.

[15]  Reza Tavakkoli-Moghaddam,et al.  Comprehensive fuzzy multi-objective multi-product multi-site aggregate production planning decisions in a supply chain under uncertainty , 2015, Appl. Soft Comput..

[16]  Ruhul A. Sarker,et al.  A genetic algorithm for permutation flowshop scheduling under practical make-to-order production system , 2017, Artificial Intelligence for Engineering Design, Analysis and Manufacturing.

[17]  Tai-Hoon Kim,et al.  Smart City and IoT , 2017, Future Gener. Comput. Syst..

[18]  Toly Chen,et al.  Ubiquitous manufacturing , 2017 .

[19]  Long Hu,et al.  ASA: Against statistical attacks for privacy-aware users in Location Based Service , 2017, Future Gener. Comput. Syst..

[20]  Bernard Grabot,et al.  A fuzzy multi-criteria decision-making approach for managing performance and risk in integrated procurement–production planning , 2017, Int. J. Prod. Res..

[21]  Juan Moreno García,et al.  A Road Departure Warning System Based on Video Motion Analysis and Fuzzy Logic , 2017, Int. J. Intell. Syst..

[22]  YangSun Lee,et al.  Design and implementation of the secure compiler and virtual machine for developing secure IoT services , 2017, Future Gener. Comput. Syst..

[23]  George Q. Huang,et al.  Event-driven multi-agent ubiquitous manufacturing execution platform for shop floor work-in-progress management , 2013 .

[24]  Manoj Kumar Tiwari,et al.  Green supply chain performance measurement using fuzzy ANP-based balanced scorecard: a collaborative decision-making approach , 2014 .

[25]  Tian Chen,et al.  A 3D, performance-driven generative design framework: automating the link from a 3D spatial grammar interpreter to structural finite element analysis and stochastic optimization , 2018, Artificial Intelligence for Engineering Design, Analysis and Manufacturing.

[26]  Scott Dick,et al.  A Fuzzy Recommender System for Public Library Catalogs , 2017, Int. J. Intell. Syst..

[27]  Ray Y. Zhong,et al.  A two-level advanced production planning and scheduling model for RFID-enabled ubiquitous manufacturing , 2015, Adv. Eng. Informatics.