Simulation for Real-Time Decision Making in Manufacturing Systems
暂无分享,去创建一个
[1] Knud Erik Wichmann. Simulation-based production schedule generation , 1990 .
[2] P. R. Kumar,et al. Real Time Scheduling of Manufacturing Systems , 1990 .
[3] Deborah J. Medeiros,et al. Real-time simulation for decision support in continuous flow manufacturing systems , 1992, WSC '92.
[4] Steven A. Melnyk,et al. Production control: issues and challenges. , 2022 .
[5] Albert Jones,et al. A real-time production scheduler for a stochastic manufacturing environment , 1988 .
[6] Sanjay Jain,et al. Expert Simulation For On-line Scheduling , 1989, 1989 Winter Simulation Conference Proceedings.
[7] B. M. Shustov,et al. An application of the , 1974 .
[8] Richard A. Wysk,et al. Multi-pass expert control system - a control/scheduling structure for flexible manufacturing cells , 1988 .
[9] Catherine M. Harmonosky,et al. Implementation issues using simulation for real-time scheduling, control, and monitoring , 1990, 1990 Winter Simulation Conference Proceedings.
[10] C. M. Harmonosky,et al. Real-time scheduling in computer integrated manufacturing: a review of recent research , 1991 .
[11] Arabinda Tripathy. Shop Floor Control Systems: From Design to Implementation , 1993 .
[12] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .
[13] Andrew Kusiak,et al. Intelligent Manufacturing Systems , 1990 .