ANALYSIS OF HVAC SUBCONTRACTOR MECHANISMS FOR JIT MATERIALS SUPPLY TO A CONSTRUCTION SITE
暂无分享,去创建一个
Iris D. Tommelein | Carlos Torres Formoso | Iris D. Tommelein | Patricia Tillmann | Daniela Dietz Viana | Zach Sargent | P. Tillmann | C. Formoso | D. D. Viana | Zach Sargent
[1] Burcu Akinci,et al. 3D Modeling and Real-Time Monitoring in Support of Lean Production of Engineered-to-Order Precast Concrete Buildings , 2003 .
[2] Iris D. Tommelein,et al. Improving the Delivery Process for Engineered-To-Order Products - Lessons Learned from Power Distribution Equipment , 2004 .
[3] Iris D. Tommelein,et al. Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique , 1998 .
[4] G. Stevens. Integrating the Supply Chain , 1989 .
[5] Iris D. Tommelein,et al. BIM AND LEAN IN THE DESIGN- PRODUCTION INTERFACE OF ETO COMPONENTS IN COMPLEX PROJECTS , 2015 .
[6] Jwm Will Bertrand,et al. Production control in engineer-to-order firms , 1993 .
[7] Lauri Koskela,et al. The four roles of supply chain management in construction , 2000 .
[8] Jerker Lessing,et al. Industrialised House-Building. Concept and Processes , 2006 .
[9] Kerry London,et al. Construction Supply Chain Management Handbook , 2008 .
[10] Salvatore T. March,et al. Design and natural science research on information technology , 1995, Decis. Support Syst..