Logical reconfiguration of reconfigurable manufacturing systems with stream of variations modelling: a stochastic two-stage programming and shortest path model
暂无分享,去创建一个
[1] Ashraf Labib,et al. A design strategy for reconfigurable manufacturing systems (RMSs) using analytical hierarchical process (AHP): A case study , 2003 .
[2] Alexandre Dolgui,et al. A taxonomy of line balancing problems and their solutionapproaches , 2013 .
[3] E David,et al. FOR INTEGER PROGRAMS , 2016 .
[4] Alexandre Dolgui,et al. Balancing lines with CNC machines: A multi-start ant based heuristic , 2010 .
[5] George L. Nemhauser,et al. Airline Crew Scheduling: A New Formulation and Decomposition Algorithm , 1997, Oper. Res..
[6] Rong-Kwei Li,et al. Process capability analysis for an entire product , 2001 .
[7] Martin W. P. Savelsbergh,et al. Branch-and-Price: Column Generation for Solving Huge Integer Programs , 1998, Oper. Res..
[8] Lihui Wang,et al. Reconfigurable manufacturing systems: the state of the art , 2008 .
[9] Charles S. Tapiero,et al. Reliability, pricing and quality control , 1987 .
[10] F. Musharavati. RECONFIGURABLE MANUFACTURING SYSTEMS , 2010 .
[11] Sylvie Gélinas,et al. A dynamic programming algorithm for the shortest path problem with time windows and linear node costs , 1994, Networks.
[12] Zhao Xiaobo,et al. A stochastic model of a reconfigurable manufacturing system Part 1: A framework , 2000 .
[13] Evan L. Porteus. Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..
[14] Shahram Payandeh,et al. Modeling and analysis of flexible fixturing systems for agile manufacturing , 1996, 1996 IEEE International Conference on Systems, Man and Cybernetics. Information Intelligence and Systems (Cat. No.96CH35929).
[15] Y. Ge,et al. Crane scheduling with time windows in circuit board production lines , 1995 .
[16] Meir J. Rosenblatt,et al. Economic Production Cycles with Imperfect Production Processes , 1986 .
[17] François Soumis,et al. An Optimization Model for the Simultaneous Operational Flight and Pilot Scheduling Problem , 2001, Manag. Sci..
[18] Hoda A. ElMaraghy,et al. Reconfigurable Process Plans For Responsive Manufacturing Systems , 2007 .
[19] Angappa Gunasekaran,et al. Effect of Dynamic Process Quality Control on the Economics of Production , 1990 .
[20] Qiang Huang,et al. Part Dimensional Error and Its Propagation Modeling in Multi-Operational Machining , 2003 .
[21] Ron S. Kenett,et al. The impact of defects on a process with rework , 1995 .
[22] Jacques Desrosiers,et al. Chapter 2 Time constrained routing and scheduling , 1995 .
[23] Alexandre Dolgui,et al. A reactive GRASP and Path Relinking for balancing reconfigurable transfer lines , 2012 .
[24] Guy Desaulniers,et al. Multi-depot vehicle scheduling problems with time windows and waiting costs , 1996, Eur. J. Oper. Res..
[25] F. Spieksma,et al. A branch‐and‐price algorithm for a hierarchical crew scheduling problem , 2002 .
[26] Shey-Huei Sheu,et al. Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorating production system , 2001, Comput. Oper. Res..
[27] Y. Tang *,et al. Integrated design approach for virtual production line-based reconfigurable manufacturing systems , 2004 .
[28] Victor E. Kane,et al. Process Capability Indices , 1986 .
[29] Roger Jianxin Jiao,et al. Mass customization design of engineer-to-order products using Benders’ decomposition and bi-level stochastic programming , 2013, J. Intell. Manuf..
[30] Jacques Desrosiers,et al. Routing with time windows by column generation , 1983, Networks.
[31] Jean-François Cordeau,et al. A computational study of Benders decomposition for the integrated aircraft routing and crew scheduling problem , 2003, Comput. Oper. Res..
[32] Gilbert Laporte,et al. A unified tabu search heuristic for vehicle routing problems with time windows , 2001, J. Oper. Res. Soc..
[33] Jacques Desrosiers,et al. Time Constrained Routing and Scheduling , 1992 .
[34] Ashraf Labib,et al. Performance evaluation of reconfigurable manufacturing systems via holonic architecture and the analytic network process , 2011 .
[35] Awi Federgruen,et al. A Combined Vehicle Routing and Inventory Allocation Problem , 1984, Oper. Res..
[36] Jianjun Shi,et al. Stream of Variation Modeling and Analysis for Multistage Manufacturing Processes , 2006 .
[37] Jacques Desrosiers,et al. A Column Generation Approach for Large-Scale Aircrew Rostering Problems , 1999, Oper. Res..