Logical reconfiguration of reconfigurable manufacturing systems with stream of variations modelling: a stochastic two-stage programming and shortest path model

This article studies logical reconfiguration of reconfigurable manufacturing systems (RMS) to minimise production lead times and buffer inventory level when the process variations and worker utilisation are considered. Since the RMS must be flexible for different job orders, the design of RMS requires diagnostic methodology and stream of variations (SoV) theory for rapid ramp-up in order to control the process variations that might occur as time goes on. The flexibility of the manufacturing systems is represented by logical elements of RMS in terms of changeable production batch size. The three phases solution is proposed by (1) utilising SoV modelling to find the allowable production lead times, (2) finding the optimum buffer stock level and production capacity at changeable production batch size and (3) finding worker routings at optimum worker utilisation. Monte carlo simulation is employed at Phase 1 to get the optimum production lead times, Phase 2 decision is formulated as a stochastic two-stages programming where buffer inventory level (first stage decison) has to be established prior to changeable production batching at future period and shortest path problems (SPP) algorithm is used to find an optimum worker routing at Phase 3. A serial inventory production (SIP) is used as an example to answer the following research questions: (1) What is the impact of SoV on both buffer inventory allocation and worker routings? (2) When is logical reconfiguration most beneficial in improving SIP profitability? (3) What is the impact of logical reconfiguration on both cost and lead time reduction? Three instances are used to investigate the effect of logical reconfiguration on the different structure of SIP systems. The results and analysis indicate that consideration of SoV is capable of increasing the profit, reducing operation lead times and maximising worker utilisation. Finally, management decision-making is discussed among other concluding remarks.

[1]  Ashraf Labib,et al.  A design strategy for reconfigurable manufacturing systems (RMSs) using analytical hierarchical process (AHP): A case study , 2003 .

[2]  Alexandre Dolgui,et al.  A taxonomy of line balancing problems and their solutionapproaches , 2013 .

[3]  E David,et al.  FOR INTEGER PROGRAMS , 2016 .

[4]  Alexandre Dolgui,et al.  Balancing lines with CNC machines: A multi-start ant based heuristic , 2010 .

[5]  George L. Nemhauser,et al.  Airline Crew Scheduling: A New Formulation and Decomposition Algorithm , 1997, Oper. Res..

[6]  Rong-Kwei Li,et al.  Process capability analysis for an entire product , 2001 .

[7]  Martin W. P. Savelsbergh,et al.  Branch-and-Price: Column Generation for Solving Huge Integer Programs , 1998, Oper. Res..

[8]  Lihui Wang,et al.  Reconfigurable manufacturing systems: the state of the art , 2008 .

[9]  Charles S. Tapiero,et al.  Reliability, pricing and quality control , 1987 .

[10]  F. Musharavati RECONFIGURABLE MANUFACTURING SYSTEMS , 2010 .

[11]  Sylvie Gélinas,et al.  A dynamic programming algorithm for the shortest path problem with time windows and linear node costs , 1994, Networks.

[12]  Zhao Xiaobo,et al.  A stochastic model of a reconfigurable manufacturing system Part 1: A framework , 2000 .

[13]  Evan L. Porteus Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..

[14]  Shahram Payandeh,et al.  Modeling and analysis of flexible fixturing systems for agile manufacturing , 1996, 1996 IEEE International Conference on Systems, Man and Cybernetics. Information Intelligence and Systems (Cat. No.96CH35929).

[15]  Y. Ge,et al.  Crane scheduling with time windows in circuit board production lines , 1995 .

[16]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[17]  François Soumis,et al.  An Optimization Model for the Simultaneous Operational Flight and Pilot Scheduling Problem , 2001, Manag. Sci..

[18]  Hoda A. ElMaraghy,et al.  Reconfigurable Process Plans For Responsive Manufacturing Systems , 2007 .

[19]  Angappa Gunasekaran,et al.  Effect of Dynamic Process Quality Control on the Economics of Production , 1990 .

[20]  Qiang Huang,et al.  Part Dimensional Error and Its Propagation Modeling in Multi-Operational Machining , 2003 .

[21]  Ron S. Kenett,et al.  The impact of defects on a process with rework , 1995 .

[22]  Jacques Desrosiers,et al.  Chapter 2 Time constrained routing and scheduling , 1995 .

[23]  Alexandre Dolgui,et al.  A reactive GRASP and Path Relinking for balancing reconfigurable transfer lines , 2012 .

[24]  Guy Desaulniers,et al.  Multi-depot vehicle scheduling problems with time windows and waiting costs , 1996, Eur. J. Oper. Res..

[25]  F. Spieksma,et al.  A branch‐and‐price algorithm for a hierarchical crew scheduling problem , 2002 .

[26]  Shey-Huei Sheu,et al.  Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorating production system , 2001, Comput. Oper. Res..

[27]  Y. Tang *,et al.  Integrated design approach for virtual production line-based reconfigurable manufacturing systems , 2004 .

[28]  Victor E. Kane,et al.  Process Capability Indices , 1986 .

[29]  Roger Jianxin Jiao,et al.  Mass customization design of engineer-to-order products using Benders’ decomposition and bi-level stochastic programming , 2013, J. Intell. Manuf..

[30]  Jacques Desrosiers,et al.  Routing with time windows by column generation , 1983, Networks.

[31]  Jean-François Cordeau,et al.  A computational study of Benders decomposition for the integrated aircraft routing and crew scheduling problem , 2003, Comput. Oper. Res..

[32]  Gilbert Laporte,et al.  A unified tabu search heuristic for vehicle routing problems with time windows , 2001, J. Oper. Res. Soc..

[33]  Jacques Desrosiers,et al.  Time Constrained Routing and Scheduling , 1992 .

[34]  Ashraf Labib,et al.  Performance evaluation of reconfigurable manufacturing systems via holonic architecture and the analytic network process , 2011 .

[35]  Awi Federgruen,et al.  A Combined Vehicle Routing and Inventory Allocation Problem , 1984, Oper. Res..

[36]  Jianjun Shi,et al.  Stream of Variation Modeling and Analysis for Multistage Manufacturing Processes , 2006 .

[37]  Jacques Desrosiers,et al.  A Column Generation Approach for Large-Scale Aircrew Rostering Problems , 1999, Oper. Res..