Common cycle lot-size scheduling for multi-product, multi-stage production
暂无分享,去创建一个
[1] M. K. El-Najdawi. A job-splitting heuristic for lot-size scheduling in multi-stage, multi-product production processes , 1994 .
[2] Robin O. Roundy,et al. Rounding Off to Powers of Two in Continuous Relaxations of Capacitated Lot Sizing Problems , 1989 .
[3] William L. Maxwell,et al. The scheduling of economic lot sizes , 1964 .
[4] Mohammad Khalil El-Najdawi. Common cycle approach to lot-size scheduling for multistage, multiproduct production processes , 1989 .
[5] Michael Pinedo,et al. Sequencing in an Assembly Line with Blocking to Minimize Cycle Time , 1989, Oper. Res..
[6] Candace Arai Yano,et al. Cyclic scheduling to minimize inventory in a batch flow line , 1994 .
[7] Evan L. Porteus,et al. Setup reduction and increased effective capacity , 1987 .
[8] H. Taha,et al. The Economic Lot Sizes in Multistage Production Systems , 1970 .
[9] William L. Maxwell,et al. Establishing Consistent and Realistic Reorder Intervals in Production-Distribution Systems , 1985, Oper. Res..
[10] S. K. Goyal. Scheduling a multi-product single machine system A new approach , 1975 .
[11] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .
[12] W. Maxwell,et al. Determining optimal reorder intervals in capacitated production-distribution systems , 1988 .
[13] L. J. Thomas,et al. Lot Sizing and Sequencing for N Products on One Facility , 1977 .
[14] Richard V. Evans. Inventory control of a multiproduct system with a limited production resource , 1967 .
[15] Kenneth R. Baker,et al. Sequencing Rules and Due-Date Assignments in a Job Shop , 1984 .
[16] S. Eilon. Economic Batch-Size Determination for Multi-Product Scheduling , 1959 .
[17] A. Z. Szendrovits. Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model , 1975 .
[18] Salah E. Elmaghraby,et al. The machine sequencing problem – review and extensions , 1968 .
[19] Alan L. Saipe,et al. Production Runs for Multiple Products: The Two-Product Heuristic , 1977 .
[20] R. Vickson,et al. Two heuristics for the economic lot scheduling problem: An experimental study , 1988 .