TREATMENT OF CORRELATION FOR RISK ANALYSIS OF ENGINEERING PROJECTS

Abstract Treatment of correlations between variables is necessary to establish realistic quantifications of uncertainty of decision variables such as project duration, cost and internal rate of return during the planning stages of an engineering project. This paper highlights some often ignored theoretical requirements necessary for a rigorous consideration of correlations and presents a general analytical procedure for eliciting and treating correlations between variables which is applicable to a broad class of engineering problems. The general case of a decision variable Y expressed in terms of an arbitrary function g(X) is examined, where X is a vector of random variables, some or all of which may be correlated. The theoretical requirement for a positive definite correlation matrix is described, along with a two stage process that leads to the elicitation of such a matrix. A variable transformation approach for treating correlations in moment analysis is used to derive the first four moments of Y. The ...

[1]  N. L. Johnson,et al.  Table of percentage points of Pearson curves, for given √β1 and β2, expressed in standard measure , 1963 .

[2]  B. Wagle,et al.  A Statistical Analysis of Risk in Capital Investment Projects , 1967 .

[3]  R. Howard Proximal Decision Analysis , 1971 .

[4]  Lawrence Kryzanowski,et al.  Monte Carlo Simulation and Capital Expenditure Decisions—A Case Study , 1972 .

[5]  James N. Siddall,et al.  Analytical decision-making in engineering design , 1972 .

[6]  Samuel Eilon,et al.  Sampling Procedures for Risk Simulation , 1973 .

[7]  J. Dickinson,et al.  COST-VOLUME-PROFIT ANALYSIS UNDER UNCERTAINTY , 1974 .

[8]  Charles S. Tapiero,et al.  Linear Breakeven Analysis Under Risk , 1975 .

[9]  A. Huitson,et al.  Statistical Models in Applied Science. , 1976 .

[10]  John C. Hull Dealing with Dependence in Risk Simulations , 1977 .

[11]  H. Toutenburg,et al.  Bury, K. V., Statisticial Models in Applied Science. New York‐London‐Sydney‐Toronto. John Wiley & Sons. 1975. 625 S., £ 14.00 . , 1977 .

[12]  Hon-Shiang Lau,et al.  Stochastic Breakeven Analysis , 1978 .

[13]  Wayne S. Smith,et al.  Interactive Elicitation of Opinion for a Normal Linear Model , 1980 .

[14]  D. Keefer,et al.  Three-Point Approximations for Continuous Random Variables , 1983 .

[15]  Ali Jaafari Criticism of CPM for Project Planning Analysis , 1984 .

[16]  J. Perry,et al.  RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS. , 1985 .

[17]  A. Kiureghian,et al.  STRUCTURAL RELIABILITY UNDER INCOMPLETE PROBABILITY INFORMATION , 1986 .

[18]  Chris Hendrickson,et al.  Hierarchical Rule‐Based Activity Duration Estimation , 1987 .

[19]  Ali Jaafari Project Viability and Economic Risk Analysis , 1988 .

[20]  Bryan Folz,et al.  Reliability-based design of wood structures , 1989 .

[21]  Alan D. Russell,et al.  Analytical approach for economic risk quantification of large engineering projects , 1992 .

[22]  Alan D. Russell,et al.  Analytical approach for economic risk quantification of large engineering projects: validation , 1992 .