A unified point-by-point planning algorithm of machining fixture layout for complex workpiece
暂无分享,去创建一个
Yiming Rong | Guohua Qin | Haichao Ye | G. Qin | Y. Rong | H. Ye
[1] Y. Kang,et al. Computer‐aided fixture design verification , 2002 .
[2] K. P. Arulshri,et al. Machining fixture layout design using ant colony algorithm based continuous optimization method , 2009 .
[3] John M. Watts,et al. Analysis and synthesis , 1985 .
[4] Yiming Rong,et al. Computer-Aided Fixture Design : Manufacturing Engineering and Materials Processing Series/55 , 1999 .
[5] Weihong Zhang,et al. A Machining-Dimension-Based Approach to Locating Scheme Design , 2008 .
[6] H. Harry Asada,et al. Kinematic analysis of workpart fixturing for flexible assembly with automatically reconfigurable fixtures , 1985, IEEE J. Robotics Autom..
[7] Kathrin Abendroth. Advanced Computer Aided Fixture Design , 2016 .
[8] Jianbin Xue,et al. Deformation control through fixture layout design and clamping force optimization , 2008 .
[9] Yiming Rong,et al. Locating completeness evaluation and revision in fixture plan , 2005 .
[10] Shahram Payandeh,et al. Modeling and analysis of flexible fixturing systems for agile manufacturing , 1996, 1996 IEEE International Conference on Systems, Man and Cybernetics. Information Intelligence and Systems (Cat. No.96CH35929).
[11] K. Rong,et al. Computer-Aided Fixture Design , 1999 .
[12] Michael Yu Wang,et al. Tolerance Analysis for Fixture Layout Design , 2002 .
[13] Weihong Zhang,et al. A mathematical approach to analysis and optimal design of a fixture locating scheme , 2006 .
[14] Andrew Y. C. Nee,et al. Computer-Aided Fixture Design , 1995 .
[15] S. Jack Hu,et al. A Variational Method of Robust Fixture Configuration Design for 3-D Workpieces , 1997 .
[16] M. M. Barash,et al. A Mathematical Approach to Automatic Configuration of Machining Fixtures: Analysis and Synthesis , 1989 .
[17] Weihong Zhang,et al. Modeling and analysis of workpiece stability based on the linear programming method , 2007 .