Cost allocation model for optimizing supply chain inventory with controllable lead time

The coordination issue of a decentralized supply chain composed of a vendor and a buyer is considered in this paper. The vendor offers a single product to the buyer and the lead time can be controllable with adding crashing cost. Two supply chain inventory models with controllable lead time under different decision modes are considered, one is proposed under decentralized model based on Stackelberg model, the other is proposed under centralized model of the integrated supply chain. The solution procedures are also suggested to get the optimal solutions of these two models. In addition, an asymmetric Nash bargaining model based on satisfaction level is also developed to get the best cost allocation ratio between the vendor and the buyer by taking their individual rationalities into consideration. The results of numerical example show that shortening lead time reasonably can reduce inventory cost and the cost allocation model based on satisfaction level developed in this paper is effective.

[1]  Eric Sucky,et al.  Production , Manufacturing and Logistics A bargaining model with asymmetric information for a single supplier – single buyer problem , 2005 .

[2]  C. Liao,et al.  An Analytical Determination of Lead Time with Normal Demand , 1991 .

[3]  R. J. Tersine,et al.  Lead‐time reduction: the search for competitive advantage , 1995 .

[4]  L. Ouyang,et al.  An integrated vendor–buyer inventory model with quality improvement and lead time reduction , 2007 .

[5]  Jason Chao-Hsien Pan,et al.  A study of an integrated inventory with controllable lead time , 2002 .

[6]  Mohamed Ben-Daya,et al.  Lead-time reduction in a stochastic inventory system with learning consideration , 2003 .

[7]  Yu-Cheng Hsiao,et al.  Integrated inventory models with controllable lead time and backorder discount considerations , 2005 .

[8]  M. Hariga,et al.  Integrated single vendor single buyer model with stochastic demand and variable lead time , 2004 .

[9]  J C-H Pan,et al.  Inventory models with fixed and variable lead time crash costs considerations , 2002, J. Oper. Res. Soc..

[10]  Graham K. Rand,et al.  Decision Systems for Inventory Management and Production Planning , 1979 .

[11]  L. Ouyang,et al.  Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time , 2004 .

[12]  L. Ouyang,et al.  Mixture inventory model involving variable lead time and controllable backorder rate , 2001 .

[13]  Jason Chao-Hsien Pan,et al.  Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment , 2004 .

[14]  Liang-Yuh Ouyang,et al.  Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction , 2006, Eur. J. Oper. Res..

[15]  Mohamed Ben-Daya,et al.  Some stochastic inventory models with deterministic variable lead time , 1999, Eur. J. Oper. Res..

[16]  L. Ouyang,et al.  Mixture Inventory Model with Backorders and Lost Sales for Variable Lead Time , 1996 .

[17]  R. Selten,et al.  A Generalized Nash Solution for Two-Person Bargaining Games with Incomplete Information , 1972 .

[18]  R. J. Tersine Principles of inventory and materials management , 1982 .

[19]  J. Nash THE BARGAINING PROBLEM , 1950, Classics in Game Theory.

[20]  Abdul Raouf,et al.  Inventory Models Involving Lead Time as a Decision Variable , 1994 .

[21]  S. Goyal “A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* , 1988 .

[22]  Ilkyeong Moon,et al.  A note on lead time and distributional assumptions in continuous review inventory models , 1998, Comput. Oper. Res..