On Service Level Measures in Stochastic Inventory Control

Abstract We consider the issue of modeling service level measures in stochastic decision making via chance constraints. More specifically we focus on service level measures in production/inventory control under stochastic demand and α service level constraints, which are constraints enforcing a prescribed non-stockout probability for the system. We introduce multiple ways of expressing these chance constraints by using conditional probability. Then we demonstrate that, when these constraints are formulated by using expressions that do not involve a conditional probability, a base stock policy is optimal for this problem only under a number of assumptions. To demonstrate this, we discuss a number of examples for simple cases in which it is possible to find better policies and we also present some analytical results. In contrast, when our novel measure involving a conditional probability is used, a base stock policy is optimal under much less restrictive assumptions, although the cost performance of the system tends to deteriorate.

[1]  David F. Pyke,et al.  Inventory management and production planning and scheduling , 1998 .

[2]  H. H. Ippolite Inventory control. , 1960, Hospital management.

[3]  Geert-Jan van Houtum,et al.  On the relationship between cost and service models for general inventory systems , 2000 .

[4]  Suresh P. Sethi,et al.  Optimality of (s, S) Policies in Inventory Models with Markovian Demand , 1995, Oper. Res..

[5]  Roberto Rossi,et al.  A Global Chance-Constraint for Stochastic Inventory Systems Under Service Level Constraints , 2008, Constraints.

[6]  James H. Bookbinder,et al.  Strategies for the Probabilistic Lot-Sizing Problem with Service-Level Constraints , 1988 .

[7]  Alexandre Dolgui,et al.  Optimal MRP offsetting for assembly systems with stochastic lead times: POQ policy and service level constraint , 2011, Journal of Intelligent Manufacturing.

[8]  Gabriel R. Bitran,et al.  Deterministic Approximations to Stochastic Production Problems , 1984, Oper. Res..

[9]  Ş. Tarim,et al.  The stochastic dynamic production/inventory lot-sizing problem with service-level constraints , 2004 .

[10]  Alexandre Dolgui,et al.  A note on analytic calculation of planned lead times for assembly systems under POQ policy and service level constraint , 2012 .

[11]  Alexandre Dolgui,et al.  Supply planning for single-level assembly system with stochastic component delivery times and service level constraint , 2008 .

[12]  Roberto Rossi,et al.  Computing the non-stationary replenishment cycle inventory policy under stochastic supplier lead-times , 2010 .