Workload planning in small lot printed circuit board assembly

The problem of workload planning in small lot printed circuit board (PCB) assembly concerns the determination of the daily mix of production orders to be released into the production system. When switching from one production order (board type) to another, a considerable set-up time is incurred based on the number of component feeders to be replaced in the component magazine of the assembly machines. To support the order-mix decision faced by a major electronics manufacturer, two versions of a linear programming model are developed. The models differ primarily in their degree of aggregation and their computational effort. In order to reduce the aggregational error incurred, a fuzzy approach is developed to estimate the number of component set-ups at automatic SMD placement machines. Our numerical investigation reveals that sufficiently accurate solutions may be obtained from a highly aggregate fuzzy LP-model and this is achieved with considerably less computational effort than with a more detailed LP-model. We also demonstrate the potential suitability of the fuzzy LP-model for implementation within an interactive decision support system.ZusammenfassungBei der Kleinserienmontage von Leiterplatten besteht das Problem der Einlastungsplanung darin, ein Tagesprogramm an Produktionsaufträgen zusammenzustellen, die gemeinsam in das Produktionssystem eingeschleust werden. Jeder Produktionsauftrag entspricht einem bestimmten Leiterplattentyp. Wechselt man bei der automatischen Bestückung von Leiterplatten zu einem neuen Leiterplattentyp, so fallen erhebliche Rüstzeiten an, die davon abhängen, wie viele Bauteilezuführungen im Magazin der Bestückungsautomaten ausgewechselt werden müssen. Zur Unterstützung dieses Entscheidungsproblems werden zwei unterschiedliche Modelle der linearen Optimierung entwickelt. Die beiden Modelle unterscheiden sich vor allem durch ihren Aggregationsgrad und ihren Rechenaufwand. Zur Verringerung des Aggregationsfehlers wird ein auf der Fuzzy-Set-Theorie beruhender Ansatz zur Abschätzung der bei automatischen SMD-Bestückungsautomanten auftretenden Rüstzeiten entwickelt. Hierbei wird als industrielles Anwendungsbeispiel die Leiterplattenbestückung in einem bedeutenden Elektronikunternehmen betrachtet. Die durchgeführte numerische Untersuchung zeigt, daß das hochaggregierte Fuzzy-LP-Modell zu hinreichend genauen Lösungen führt und erheblich geringeren Rechenaufwand verursacht als ein detaillierteres LP-Modell. Außerdem wird die praktische Eignung des Fuzzy-LP-Modells für den Einsatz innerhalb eines interaktiven Entscheidungsunterstützungssystems verdeutlicht.

[1]  Manfred Gronalt,et al.  A Linear Programming Model for Workload Planning in Printed Circuit Board Assembly , 1995 .

[2]  David F. Rogers,et al.  Similarity and distance measures for cellular manufacturing. Part II. An extension and comparison , 1993 .

[3]  Seok Hwan Moon,et al.  Work flow control in the flexible flow line , 1992 .

[4]  Leon F. McGinnis,et al.  T𝕙roughput Rate Maximization In Flexible Manufacturing Cells , 1988 .

[5]  Moshe Dror,et al.  Printed circuit board family grouping and component allocation for a multimachine, open-shop assembly cell , 1994 .

[6]  Christoph Schneeweiβ,et al.  Hierarchical structures in organisations: A conceptual framework , 1995 .

[7]  Frits C. R. Spieksma,et al.  Minimizing the number of tool switches on a flexible machine , 1994 .

[8]  Ch. Schneeweiss On a formalisation of the process of quantitative model building , 1987 .

[9]  Michael O. Ball,et al.  Sequencing of Insertions in Printed Circuit Board Assembly , 1988, Oper. Res..

[10]  Christopher S. Tang,et al.  Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches , 1988, Oper. Res..

[11]  A. Kusiak,et al.  Similarity coefficient algorithms for solving the group technology problem , 1992 .

[12]  Hans-Otto Günther,et al.  A heuristic for component switching on SMT placement machines , 1997 .

[13]  W. H. M. Zijm,et al.  Production preparation and numerical control in PCB assembly , 1993 .

[14]  Robert J. Wittrock,et al.  An Adaptable Scheduling Algorithm for Flexible Flow Lines , 1988, Oper. Res..

[15]  Leon F. McGinnis,et al.  AUTOMATED PROCESS PLANNING FOR PRINTED CIRCUIT CARD ASSEMBLY , 1992 .

[16]  Pravin K. Johri A heuristic algorithm for loading new work on circuit pack assembly lines , 1990 .

[17]  Panagiotis Kouvelis,et al.  Staging Problem of a Dual Delivery Pick-and-Place Machine in Printed Circuit Card Assembly , 1994, Oper. Res..

[18]  G. Laporte The traveling salesman problem: An overview of exact and approximate algorithms , 1992 .

[19]  Oded Maimon,et al.  Set-up saving schemes for printed circuit boards assembly , 1993 .

[20]  Thomas L. Landers,et al.  A heuristic algorithm for minimizing total production time for a sequence of jobs on a surface mount placement machine , 1993 .

[21]  Jonathan F. Bard,et al.  Machine setup and component placement in printed circuit board assembly , 1994 .

[22]  Frits C. R. Spieksma,et al.  Throughput rate optimization in the automated assembly of printed circuit boards , 1991 .

[23]  H. Zimmermann Fuzzy sets, decision making, and expert systems , 1987 .

[24]  David F. Rogers,et al.  Similarity and distance measures for cellular manufacturing. Part I. A survey , 1993 .

[25]  Robert J. Wittrock The "Orchard" scheduler for manufacturing systems , 1992 .