OBJECTIVES
Two-pilot operations make up the majority of commercial flights. Fatigue is an important consideration in these operations as there is little opportunity for in-flight rest. We investigated the role of duty length, time of day, and whether one or two sectors were flown on reported fatigue at the top of descent in two-pilot regional operations.
METHODS
Pilots flying two-pilot operations ranging from 3-12 h completed Samn-Perelli fatigue ratings prior to descent at the end of each rostered duty over a 12-wk period. We collected 3023 usable ratings (72% of rostered duties) comprising 26% single and 74% double sector duties.
RESULTS
We found that time of day has a marked effect on the pattern of fatigue at the start of the duty and on the rate at which fatigue levels increased, with the highest levels in the window of circadian low (0200-0600). Fatigue also increased with the length of duty and was 0.56 higher at the end of a two-sector compared with a single-sector duty.
DISCUSSION
The results imply authorities should consider increasing existing limits for daytime duties and reducing those for nighttime two-pilot operations.
[1]
Torbjörn Akerstedt,et al.
Fatigue in trans-Atlantic airline operations: diaries and actigraphy for two- vs. three-pilot crews.
,
2006,
Aviation, space, and environmental medicine.
[2]
Jeffrey H Goode,et al.
Are pilots at risk of accidents due to fatigue?
,
2003,
Journal of safety research.
[3]
E. Broadbent,et al.
Pilot fatigue in short-haul operations: effects of number of sectors, duty length, and time of day.
,
2007,
Aviation, space, and environmental medicine.
[4]
D. Manzey,et al.
Two-crew operations: stress and fatigue during long-haul night flights.
,
1997,
Aviation Space and Environmental Medicine.