Short–Term Planning of Hybrid Power System

Abstract In this paper short-term planning algorithm for hybrid power system consist of different types of cascade hydropower plants (run-of-the river, pumped storage, conventional), thermal power plants (coal-fired power plants, combined cycle gas-fired power plants) and wind farms is presented. The optimization process provides a joint bid of the hybrid system, and thus making the operation schedule of hydro and thermal power plants, the operation condition of pumped-storage hydropower plants with the aim of maximizing profits on day ahead market, according to expected hourly electricity prices, the expected local water inflow in certain hydropower plants, and the expected production of electrical energy from the wind farm, taking into account previously contracted bilateral agreement for electricity generation. Optimization process is formulated as hourly-discretized mixed integer linear optimization problem. Optimization model is applied on the case study in order to show general features of the developed model.

[1]  A. Conejo,et al.  Evaluating alternative offering strategies for wind producers in a pool , 2011 .

[2]  Ehab F. El-Saadany,et al.  Overview of wind power intermittency impacts on power systems , 2010 .

[3]  John K. Kaldellis Parametrical investigation of the wind-hydro electricity production solution for Aegean Archipelago , 2002 .

[4]  Julio Usaola,et al.  Combining hydro-generation and wind energy: Biddings and operation on electricity spot markets , 2007 .

[5]  J.A.P. Lopes,et al.  On the optimization of the daily operation of a wind-hydro power plant , 2004, IEEE Transactions on Power Systems.

[6]  K. A. Kavadias,et al.  Energy balance analysis of wind-based pumped hydro storage systems in remote island electrical networks , 2010 .

[7]  K. Fekete,et al.  The influence of wind park krš-pađene on reliability indices of 110 kV transmission network , 2011, 2011 8th International Conference on the European Energy Market (EEM).

[8]  A. Borghetti,et al.  An MILP Approach for Short-Term Hydro Scheduling and Unit Commitment With Head-Dependent Reservoir , 2008, IEEE Transactions on Power Systems.

[9]  S. A. Papathanassiou,et al.  Operating Policy and Optimal Sizing of a High Penetration RES-BESS System for Small Isolated Grids , 2011, IEEE Transactions on Energy Conversion.

[10]  Lennart Söder,et al.  Minimizing regulation costs in multi‐area systems with uncertain wind power forecasts , 2006 .

[11]  Helena M. Ramos,et al.  Hybrid solution and pump-storage optimization in water supply system efficiency: A case study , 2008 .

[12]  Stefanos V. Papaefthymiou,et al.  A Wind-Hydro-Pumped Storage Station Leading to High RES Penetration in the Autonomous Island System of Ikaria , 2010, IEEE Transactions on Sustainable Energy.

[13]  Joao P. S. Catalao,et al.  Nonlinear optimization method for short‐term hydro scheduling considering head‐dependency , 2008 .

[14]  E. Nykänen,et al.  Power Systems with Large Amounts of Wind Power , 2009 .

[15]  John K. Kaldellis,et al.  Optimal wind-hydro solution for Aegean Sea islands' electricity-demand fulfilment , 2001 .

[16]  S. Stamataki,et al.  Introduction of a wind powered pumped storage system in the isolated insular power system of Karpathos-Kasos , 2012 .

[17]  Fabian Mueller,et al.  Metrics for evaluating the impacts of intermittent renewable generation on utility load-balancing , 2012 .

[18]  J.A.P. Lopes,et al.  Bounding active power generation of a wind-hydro power plant , 2004, 2004 International Conference on Probabilistic Methods Applied to Power Systems.

[19]  Lei Zhang,et al.  Optimal energy management of hybrid power system with two-scale dynamic programming , 2011, 2011 IEEE/PES Power Systems Conference and Exposition.

[20]  O. A. Jaramillo,et al.  Using hydropower to complement wind energy: a hybrid system to provide firm power , 2004 .

[21]  Stavros A. Papathanassiou,et al.  Operating Policies for Wind-Pumped Storage Hybrid Power Stations in Island Grids , 2009 .

[22]  Lennart Söder,et al.  Efficient Operation and Planning of Power Systems , 2011 .

[23]  J. Keppler,et al.  Projected Costs of Generating Electricity : 2010 Edition , 2010 .

[24]  Luc Gagnon,et al.  Adding wind energy to hydropower , 2002 .

[25]  J. Garcia-Gonzalez,et al.  Short-term hydro scheduling with cascaded and head-dependent reservoirs based on mixed-integer linear programming , 2001, 2001 IEEE Porto Power Tech Proceedings (Cat. No.01EX502).