Joint Optimization of Condition-Based Repair-by-Replacement and Spare Parts Provisioning Policy with Random Maintenance Time and Lead Time

A joint strategy, referred to as periodical condition-based repair-by-replacement and continuous reviewed (S,s) type spare provisioning policy, is presented for continuous deteriorating systems with a known number of identical repairable components. Maintenance consists of replacing all failed and/or deteriorated components, and then deteriorated components being repaired off-line. With assumptions of random repair time, random lead time for spare parts ordering and imperfect maintenance effect, a stochastic simulation model is developed to determine the jointly optimal strategy. The objective function of the model represents the average cost per component per unit time over an infinite time span, while inspection interval, preventive replacement threshold, spare part inventory levels and repair capacity are chosen as decision variables. The optimal result is obtained using integrating approach with discrete event simulation and genetic algorithm (GA). Simulation results indicate that there are trades-off among maintenance policy, spare parts inventory and repair capacity.

[1]  Weijie Mao,et al.  A condition-based order-replacement policy for a single-unit system , 2008 .

[2]  Shey-Huei Sheu,et al.  Optimal age-replacement policy of a system subject to shocks with random lead-time , 2004, Eur. J. Oper. Res..

[3]  S. H. A. Farrash,et al.  Simulation of an integrated age replacement and spare provisioning policy using SLAM , 1996 .

[4]  Chung-Ho Wang,et al.  A hybrid genetic algorithm to minimize the periodic preventive maintenance cost in a series-parallel system , 2012, J. Intell. Manuf..

[5]  Yuo-Tern Tsai,et al.  Optimizing preventive maintenance for mechanical components using genetic algorithms , 2001, Reliab. Eng. Syst. Saf..

[6]  Dragan Banjevic,et al.  Condition-based spares ordering for critical components , 2011 .

[7]  Zhang Xiao-hon Joint optimization of condition-based repair-by-replacement and spare parts provisioning policy for repairable critical components , 2014 .

[8]  Yinghui Tang,et al.  A deteriorating repairable system with stochastic lead time and replaceable repair facility , 2012, Comput. Ind. Eng..

[9]  Ling Wang,et al.  A condition-based replacement and spare provisioning policy for deteriorating systems with uncertain deterioration to failure , 2009, Eur. J. Oper. Res..

[10]  H. Pham,et al.  Invited reviewImperfect maintenance , 1996 .

[11]  Hongzhou Wang,et al.  A survey of maintenance policies of deteriorating systems , 2002, Eur. J. Oper. Res..

[12]  Mohammed Hajeeh,et al.  Multiple component series systems with imperfect repair , 2009 .

[13]  Luca Podofillini,et al.  Multiobjective spare part allocation by means of genetic algorithms and Monte Carlo simulation , 2005, Reliab. Eng. Syst. Saf..

[14]  Ling-Yau Chan,et al.  Maintenance models for a continuously degrading system , 2010, Comput. Ind. Eng..

[15]  Wenbin Wang,et al.  A prognostics-based spare part ordering and system replacement policy for a deteriorating system subjected to a random lead time , 2015 .

[16]  Bo Guo,et al.  Collaborative optimization of maintenance and spare ordering of continuously degrading systems , 2012 .

[17]  Matthieu van der Heijden,et al.  Joint optimisation of spare part inventory, maintenance frequency and repair capacity for k-out-of-N systems , 2009 .

[18]  Rommert Dekker,et al.  Optimal maintenance of multi-component systems: a review , 2008 .