Focusing on the limitations of the traditional CCDHCR scheduling methods that are in high planning complexity and rarely attack dynamic scheduling problem, a new CC-DHCR integrated planning and scheduling method base on slab cluster is put forward. The key idea is, on one hand, to classify slabs and coils into slab clusters and coil clusters respectively according to the slab and coil clustering rules in the batch planning layer, so as to improve the planing efficiency; On the other hand, to design slab cluster based strategy in the dynamic scheduling layer, based on which the sequences of entering the reheat furnace for slabs from the same slab cluster can be adjusted dynamically according to the actual production conditions. Results of test with data from practical production process show that the method can effectively solve the CC-DHCR scheduling problem, and increase the DHCR ratio.
[1]
Sanja Petrovic,et al.
A multi-agent architecture for dynamic scheduling of steel hot rolling
,
2003,
J. Intell. Manuf..
[2]
Xu Jin-wu,et al.
Model and Algorithm of Integrative Batch Planning Based on Parallel Strategy for Steelmaking-continuous Casting-hot Rolling
,
2006
.
[3]
Yu Hai-bin.
Production Scheduling Model and Algorithm for Steelmaking-Continuous Casting-Hot Rolling Processes
,
2003
.
[4]
Peter I. Cowling,et al.
Integration of continuous caster and hot strip mill planning for steel production
,
2000
.
[5]
Sun Lin.
Model and Algorithm for Steelmaking-Continuous Casting Scheduling in DHCR and CCR Environment
,
2006
.
[6]
Ho Soo Lee,et al.
Primary production scheduling at steelmaking industries
,
1996,
IBM J. Res. Dev..