Gestion des ressources humaines en production cyclique
暂无分享,去创建一个
[1] Fayez F. Boctor,et al. The G-group heuristic to solve the multi-product, sequencing, lot sizing and scheduling problem in flow shops , 2001 .
[2] P. Castro,et al. Optimal Periodic Scheduling of Batch Plants Using RTN-Based Discrete and Continuous-Time Formulations: A Case Study Approach , 2003 .
[3] L. Ritzman,et al. A cyclical scheduling heuristic for lot sizing with capacity constraints , 1984 .
[4] Vincent A. Mabert,et al. Integrative versus separate cycle scheduling heuristics for capacitated discrete lot sizing and sequencing problems , 1995 .
[5] Edward A. Silver. Dealing with a shelf life constraint in cyclic scheduling by adjusting both cycle time and production rate , 1995 .
[6] Kathryn A. Dowsland,et al. Nurse scheduling with tabu search and strategic oscillation , 1998, Eur. J. Oper. Res..
[7] Stéphane Dauzère-Pérès,et al. Multi-resource shop scheduling with resource flexibility , 1998, Eur. J. Oper. Res..
[8] Jacek Blazewicz,et al. Scheduling in Computer and Manufacturing Systems , 1990 .
[9] Zied Bahroun. Contribution à la planification et à la gestion dynamique des systèmes de production cyclique , 2000 .
[10] Marco Perona,et al. Work-force management in automated assembly systems , 2000 .
[11] Fayez F. Boctor. A more efficient formulation of the single machine, static demand, lot scheduling problem , 1988 .
[12] Paul R. Kleindorfer,et al. Common cycle lot-size scheduling for multi-product, multi-stage production , 1993 .
[13] Liping Cheng,et al. A simple sequencing algorithm for mixed-model assembly lines in just-in-time production systems , 1993, Oper. Res. Lett..
[14] Jean-Claude Hennet,et al. A common cycle approach to lot-scheduling in multistage manufacturing systems , 2001 .
[15] John I. S. Hsu,et al. Common cycle scheduling in a multistage production process , 1990 .
[16] Turgut Aykin,et al. A comparative evaluation of modeling approaches to the labor shift scheduling problem , 2000, Eur. J. Oper. Res..
[17] Liping Cheng,et al. AN EFFECTIVE MIXED-MODEL ASSEMBLY LINE SEQUENCING HEURISTIC FOR JUST-IN-TIME PRODUCTION SYSTEMS , 1993 .
[18] Patricia Jones,et al. Are educated workers really more productive , 2001 .
[19] S. Sethi,et al. A Note on "Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems" , 1991 .
[20] Andreas T. Ernst,et al. Staff scheduling and rostering: A review of applications, methods and models , 2004, Eur. J. Oper. Res..
[21] Mohamed Moalla,et al. Production planning and scheduling in the context of cyclic delivery schedules , 1999 .
[22] Gary M. Thompson. A simulated-annealing heuristic for shift scheduling using non-continuously available employees , 1996, Comput. Oper. Res..
[23] J. M. Pinto,et al. Optimal cyclic scheduling of multistage continuous multiproduct plants , 1994 .
[24] R. Ramesh,et al. Cyclic scheduling heuristics for a re-entrant job shop manufacturing environment , 2001 .
[25] Jean-Marie Proth,et al. Optimization of cyclic production systems: a heuristic approach , 2003, IEEE Trans. Robotics Autom..
[26] Jwm Will Bertrand,et al. The finite horizon economic lot sizing problem in job shops: The multiple cycle approach , 2001 .
[27] Peter Loos,et al. Gozintographs for By-Products and Cyclic Production: An Approach for ERP System Application , 2001 .
[28] S. T. Mccormick,et al. Some complexity results in cyclic scheduling , 1994 .
[29] Alain Billionnet. Integer programming to schedule a hierarchical workforce with variable demands , 1999, Eur. J. Oper. Res..
[30] Wieslaw Kubiak,et al. Optimal just-in-time schedules for flexible transfer lines , 1994 .
[31] Pierre Baptiste,et al. Ordonnancement des ressources humaines: étude du cas d'une entreprise d'injection plastique , 2002 .
[32] Zied Bahroun,et al. Une nouvelle approche de planification à capacité finie pour les ateliers flow-shop , 2000 .
[33] Faizul Huq,et al. Employee scheduling and makespan minimization in a flow shop with multi-processor work stations: a case study , 2004 .
[34] Vincent A. Mabert,et al. Cyclical schedules for capacitated lot sizing with dynamic demands , 1991 .
[35] Anders Segerstedt. A capacity-constrained multi-level inventory and production control problem , 1996 .
[36] Robert W. Hall. Cyclic scheduling for improvement , 1988 .
[37] I. K. Altinel,et al. General continuous time models for production planning and scheduling of batch processing plants: mixed integer linear program formulations and computational issues , 2001 .