Application of AHP for Ranking of Total Productive Maintenance Pillars

Total Productive Maintenance—TPM is widely being used in industries for manufacturing excellence. TPM is based on its eight pillars. Successful Implementation of TPM from its kick-off to final stage depends on in-depth knowledge of these pillars. The purpose of the paper is to rank eight pillars of TPM according to their importance with respect to four parameters: Productivity, Cost, Quality and Delivery in Time, by using Analytic Hierarchy Process (AHP) a multiple criteria decision-making methodology. A pairwise comparison of TPM pillars is done by use of AHP method, by considering a case of automotive industries in India. Ranking of TPM pillars is proposed to set guidelines to decide the weightage of each pillar in terms of major factors to improve Overall Equipment Efficiency. This in terms will guide management to give proper preference and allocate fund at proper time to proper pillar. The ranking suggested suites for automotive sector and assembly lines. By varying the judgmental rating the new ranking can be obtained from the suggested guidelines on similar basis.

[1]  Rambabu Kodali,et al.  Analytical hierarchy process for justification of total productive maintenance , 2001 .

[2]  Alessio Ishizaka,et al.  Selection of new production facilities with the Group Analytic Hierarchy Process Ordering method , 2011, Expert Syst. Appl..

[3]  Christian N. Madu,et al.  On the total productivity management of a maintenance float system through AHP applications , 1994 .

[4]  Nebil Buyurgan,et al.  Application of the analytical hierarchy process for real-time scheduling and part routing in advanced manufacturing systems , 2008 .

[5]  Sandeep Grover,et al.  Analysis of barriers of total productive maintenance (TPM) , 2013, Int. J. Syst. Assur. Eng. Manag..

[6]  Alessio Ishizaka,et al.  Review of the main developments in the analytic hierarchy process , 2011, Expert Syst. Appl..

[7]  T. Saaty,et al.  The Analytic Hierarchy Process , 1985 .

[8]  T. Saaty How to Make a Decision: The Analytic Hierarchy Process , 1990 .

[9]  Sachit Vardhan,et al.  Study of success factors of TPM implementation in Indian industry towards operational excellence: An overview , 2015, 2015 International Conference on Industrial Engineering and Operations Management (IEOM).

[10]  Inderpreet Singh Ahuja,et al.  Strategies and success factors for overcoming challenges in TPM implementation in Indian manufacturing industry , 2008 .

[11]  Sushil Kumar,et al.  Analytic hierarchy process: An overview of applications , 2006, Eur. J. Oper. Res..

[12]  T. Miranda Lakshmi,et al.  A Survey on Multi Criteria Decision Making Methods and Its Applications , 2013 .

[13]  Sandeep Grover,et al.  A graph theoretic approach to evaluate the intensity of barriers in the implementation of total productive maintenance (TPM) , 2014 .

[14]  Inderpreet Singh Ahuja,et al.  An evaluation of TPM implementation initiatives in an Indian manufacturing enterprise , 2007 .

[15]  Xin Li,et al.  Research on total quality management based on AHP , 2010, 2010 Second Pacific-Asia Conference on Circuits, Communications and System.

[16]  Abdul Talib Bon,et al.  Total Productive Maintenance in automotive industry: Issues and effectiveness , 2015, 2015 International Conference on Industrial Engineering and Operations Management (IEOM).