Which is better for replacement policies with continuous or discrete scheduled times?

In order to maintain a unit that is running successive works with cycle times, this paper classifies its replacement policies into three types: (Type I) Replacement with interrupted cycles; (Type II) replacement with complete works; and (Type III) replacement with incomplete works. Type I is typically done at a continuous time T while Type II is executed at a discrete number N of working cycles. Type III is proposed as an improvement of Type I, which can be done at discrete working cycles. For each type, age and periodic replacement models are respectively observed. It is shown that Type I is more flexible than Type II and costs less than Type III. However, modified replacement costs, i.e., without penalty of operational interruptions, are obtained for Types II and III as critical points at which their policies should be adopted. All discussions are presented analytically and numerical examples are given when each cycle time is exponential and the failure time has a Weibull distribution.

[1]  Yen-Luan Chen,et al.  A bivariate optimal imperfect preventive maintenance policy for a used system with two-type shocks , 2012, Comput. Ind. Eng..

[2]  T Duchesne,et al.  Alternative Time Scales and Failure Time Models , 2000, Lifetime data analysis.

[3]  D. N. P. Murthy,et al.  Complex System Maintenance Handbook , 2008 .

[4]  Shaomin Wu,et al.  Linear and Nonlinear Preventive Maintenance Models , 2010, IEEE Transactions on Reliability.

[5]  Hongzhou Wang,et al.  A survey of maintenance policies of deteriorating systems , 2002, Eur. J. Oper. Res..

[6]  Wenbin Wang,et al.  An overview of the recent advances in delay-time-based maintenance modelling , 2012, Reliab. Eng. Syst. Saf..

[7]  Toshio Nakagawa,et al.  Optimization problems of replacement first or last in reliability theory , 2012, Eur. J. Oper. Res..

[8]  Shahrul Kamaruddin,et al.  An overview of time-based and condition-based maintenance in industrial application , 2012, Comput. Ind. Eng..

[9]  Mahmood Shafiee,et al.  Maintenance models in warranty: A literature review , 2013, Eur. J. Oper. Res..

[10]  Ming J. Zuo,et al.  A bivariate optimal replacement policy for a multistate repairable system , 2007, Reliab. Eng. Syst. Saf..

[11]  Toshio Nakagawa,et al.  Comparisons of Periodic and Random Replacement Policies , 2013 .

[12]  Shunji Osaki Stochastic Models in Reliability and Maintenance , 2002 .

[13]  Anatoly Lisnianski,et al.  Applied Reliability Engineering and Risk Analysis: Probabilistic Models and Statistical Inference , 2013 .

[14]  Toshio Nakagawa,et al.  Optimal Replacement Last With Continuous and Discrete Policies , 2014, IEEE Transactions on Reliability.

[15]  Derek Clements-Croome,et al.  Preventive maintenance models with random maintenance quality , 2005, Reliab. Eng. Syst. Saf..

[16]  Riccardo Manzini,et al.  Maintenance for Industrial Systems , 2009 .

[17]  Shey-Huei Sheu,et al.  A generalised maintenance policy with age-dependent minimal repair cost for a system subject to shocks under periodic overhaul , 2012, Int. J. Syst. Sci..

[18]  G. Enderlein Barlow, E. E., F. Proschan and L. C. Hunter: Mathematical Theory of Reliability. Wiley, New York‐London‐Sydney 1965. 256 S., Preis 83 s , 1966 .

[19]  Toshio Nakagawa,et al.  RANDOM AND AGE REPLACEMENT POLICIES , 2010 .

[20]  Shey-Huei Sheu,et al.  Extended periodic imperfect preventive maintenance model of a system subjected to shocks , 2010, Int. J. Syst. Sci..

[21]  M. Zuo,et al.  Optimal Reliability Modeling: Principles and Applications , 2002 .