Mitigation of delays attributable to the contractors in the construction industry of Sri Lanka - consultants’perspective
暂无分享,去创建一个
[1] Mohammed Al-Khalil,et al. Important causes of delay in public utility projects in Saudi Arabia , 1999 .
[2] Sadi Assaf,et al. Causes of Delay in Large Building Construction Projects , 1995 .
[3] Mohan M. Kumaraswamy,et al. Determinants of construction duration , 1995 .
[4] Mohan M. Kumaraswamy,et al. A comparative study of causes of time overruns in Hong Kong construction projects , 1997 .
[5] D. A. R. Dolage,et al. Delays in the Pre-Construction Phase of State Sector Building Projects , 2009 .
[6] Rangika Halwatura,et al. Factors influencing the duration of road construction projects in Sri Lanka , 2010 .
[7] Sadi Assaf,et al. Causes of delay in large construction projects , 2006 .
[8] Mohan M. Kumaraswamy,et al. Contributors to construction delays , 1998 .
[9] Adel Abdulaziz Al-Barrak. Causes of contractors' failures in Saudi Arabia , 1993 .
[10] Murali Sambasivan,et al. Causes and effects of delays in Malaysian construction industry , 2007 .
[11] David Arditi,et al. Construction Delay Computation Method , 2001 .
[12] D. A. R. Dolage,et al. Causes of time overrun in construction phase of building projects : a case study on Department of Engineering Services of Sabaragamuwa Provincial Council , 2013 .