Single-machine scheduling problems with a batch-dependent aging effect and variable maintenance activities

We consider single-machine scheduling problems with a batch-dependent ageing effect and variable maintenance activities between batches. The machine can process several jobs as a batch. It requires maintenance activities where the maintenance time depends on the flow time of the pre-batch, i.e. the batch processed before a batch. A job’s actual processing time is an increasing exponential function of its operation time within a batch. The objectives are to minimise the makespan and the total completion time. We develop polynomial time algorithms for the makespan minimisation problem and the total completion time minimisation problem under the condition that the ageing factor is greater than one. We also provide a mathematical programming approach and two heuristic algorithms to analyse the total completion time minimisation problem when the ageing factor is less than one for even one batch. The computational analysis indicates that the proposed heuristic algorithms are more efficient for the smaller ageing factor, whereas the Modified Shortest Processing Time algorithm is more efficient than the proposed heuristic algorithms for the larger ageing factor.

[1]  Giuseppe Paletta,et al.  Makespan minimisation with sequence-dependent machine deterioration and maintenance events , 2017, Int. J. Prod. Res..

[2]  Gur Mosheiov,et al.  Scheduling jobs under simple linear deterioration , 1994, Comput. Oper. Res..

[3]  Inyong Ham,et al.  Group Technology: Applications to Production Management , 2011 .

[4]  Ji-Bo Wang,et al.  Single-machine total completion time scheduling with a time-dependent deterioration , 2011 .

[5]  Chuanli Zhao,et al.  A note on single machine scheduling and due date assignment with general position-dependent processing times , 2014 .

[6]  Stanislaw Gawiejnowicz,et al.  Time-Dependent Scheduling , 2008, Monographs in Theoretical Computer Science. An EATCS Series.

[7]  Jatinder N. D. Gupta,et al.  Single facility scheduling with nonlinear processing times , 1988 .

[8]  D. Yang,et al.  Single machine total completion time scheduling problem with workload-dependent maintenance duration , 2015 .

[9]  Dar-Li Yang,et al.  Minimizing the makespan in a single-machine scheduling problem with the cyclic process of an aging effect , 2008, J. Oper. Res. Soc..

[10]  M. Cheng,et al.  Computational method for optimal machine scheduling problem with maintenance and production , 2017, Int. J. Prod. Res..

[11]  Min Li,et al.  Machine scheduling with deteriorating and resource-dependent maintenance activity , 2015, Comput. Ind. Eng..

[12]  Christopher D. Geiger,et al.  A note on the optimal sequence position for a rate-modifying activity under simple linear deterioration , 2010, Eur. J. Oper. Res..

[13]  T.C.E. Cheng,et al.  Due-date assignment and single-machine scheduling with generalised position-dependent deteriorating jobs and deteriorating multi-maintenance activities , 2014 .

[14]  Suresh Chand,et al.  Learning and forgetting effects on a group scheduling problem , 2008, Eur. J. Oper. Res..

[15]  T. C. Edwin Cheng,et al.  Single-machine scheduling with a variable maintenance activity , 2015, Comput. Ind. Eng..

[16]  M. Azizoglu,et al.  Single machine scheduling with preventive maintenances , 2009 .

[17]  Min Ji,et al.  Single-machine scheduling with deteriorating jobs and aging effects under an optional maintenance activity consideration , 2013, J. Comb. Optim..

[18]  Renato de Matta,et al.  Scheduling a manufacturing process with restrictions on resource availability , 2018, Int. J. Prod. Res..

[19]  Alexander V. Kononov,et al.  Complexity and approximability of scheduling resumable proportionally deteriorating jobs , 2010, Eur. J. Oper. Res..

[20]  Ji-Bo Wang,et al.  Single-machine group scheduling with both learning effects and deteriorating jobs , 2011, Comput. Ind. Eng..

[21]  Suh-Jenq Yang,et al.  Group scheduling problems with simultaneous considerations of learning and deterioration effects on a single-machine , 2011 .

[22]  Jatinder N. D. Gupta,et al.  Single machine scheduling with time deteriorating job values , 2008, J. Oper. Res. Soc..

[23]  Bertrand M. T. Lin,et al.  A concise survey of scheduling with time-dependent processing times , 2004, Eur. J. Oper. Res..

[24]  Dar-Li Yang,et al.  Single-machine group scheduling with a time-dependent learning effect , 2006, Comput. Oper. Res..

[25]  Radosław Rudek,et al.  Some single-machine scheduling problems with the extended sum-of-processing-time-based aging effect , 2011, The International Journal of Advanced Manufacturing Technology.

[26]  Adam Janiak,et al.  Scheduling jobs under an aging effect , 2010, J. Oper. Res. Soc..

[27]  Bahram Alidaee,et al.  Scheduling with time dependent processing times: Review and extensions , 1999, J. Oper. Res. Soc..

[28]  Sid Browne,et al.  Scheduling Deteriorating Jobs on a Single Processor , 1990, Oper. Res..

[29]  T.C.E. Cheng,et al.  Scheduling start time dependent jobs to minimize the total weighted completion time , 2002, J. Oper. Res. Soc..

[30]  Suh-Jenq Yang,et al.  Computers and Mathematics with Applications Minimizing the Total Completion Time in Single-machine Scheduling with Aging/deteriorating Effects and Deteriorating Maintenance Activities , 2022 .

[31]  Chin-Chia Wu,et al.  Single-machine scheduling and common due date assignment with potential machine disruption , 2018, Int. J. Prod. Res..

[32]  Radoslaw Rudek,et al.  The strong NP-hardness of the maximum lateness minimization scheduling problem with the processing-time based aging effect , 2012, Appl. Math. Comput..

[33]  Li-Yan Wang,et al.  Single-machine scheduling with a time-dependent deterioration , 2009 .

[34]  Stanisław Gawiejnowicz,et al.  Basics of time-dependent scheduling , 2008 .

[35]  Chung-Yee Lee,et al.  Single-machine scheduling with maintenance and repair rate-modifying activities , 2001, Eur. J. Oper. Res..

[36]  Patrick R. McMullen,et al.  A correlation and heuristic approach for obtaining production sequences requiring a minimum of tool replacements , 2003, Comput. Oper. Res..

[37]  Lifeng Xi,et al.  Single-machine group scheduling problem considering learning, forgetting effects and preventive maintenance , 2014 .

[38]  Wen-Chiung Lee,et al.  A note on single-machine makespan problem with general deteriorating function , 2009 .

[39]  Wen-Hung Kuo Single-machine group scheduling with time-dependent learning effect and position-based setup time learning effect , 2012, Ann. Oper. Res..