Root-Cause Analysis of Construction-Cost Overruns
暂无分享,去创建一个
[1] Zhen-Yu Zhao,et al. Applying Dependency Structure Matrix and Monte Carlo simulation to predict change in construction project , 2008, 2008 International Conference on Machine Learning and Cybernetics.
[2] Jin-Kyung Lee,et al. Cost Overrun and Cause in Korean Social Overhead Capital Projects: Roads, Rails, Airports, and Ports , 2008 .
[3] Seung Heon Han,et al. Discriminant Analysis for Predicting Ranges of Cost Variance in International Construction Projects , 2008 .
[4] J. Iwamatsu,et al. Construction Claims and Disputes and the Business Culture of Construction in Japan , 2008 .
[5] Norman Bresky. Root Cause Analysis: Simplified Tools and Techniques (2nd ed.), by Bjorn Andersen and Tom Fagerhaug , 2007 .
[6] Mohan M. Kumaraswamy,et al. International treatise on construction specification problems from a legal perspective , 2007 .
[7] Murali Sambasivan,et al. Causes and effects of delays in Malaysian construction industry , 2007 .
[8] Chien-Liang Lin,et al. Contractor’s Opportunistic Bidding Behavior and Equilibrium Price Level in the Construction Market , 2007 .
[9] Ajibade A. Aibinu,et al. Construction delays and their causative factors in Nigeria , 2006 .
[10] Essam Zaneldin,et al. Construction claims in United Arab Emirates: Types, causes, and frequency , 2006 .
[11] Tommy Y. Lo,et al. Construction Delays in Hong Kong Civil Engineering Projects , 2006 .
[12] Ajibade Ayodeji Aibinu,et al. The relationship between distribution of control, fairness and potential for dispute in the claims handling process , 2006 .
[13] Ting-ya Hsieh,et al. Statistical analysis of causes for design change in highway construction on Taiwan , 2005 .
[14] J. Rooke,et al. Planning for claims: an ethnography of industry culture , 2004 .
[15] GERARD DE JONG,et al. National and International Freight Transport Models: An Overview and Ideas for Future Development , 2004 .
[16] Søren L. Buhl,et al. What Causes Cost Overrun in Transport Infrastructure Projects? , 2004, 1304.4476.
[17] Søren L. Buhl,et al. How common and how large are cost overruns in transport infrastructure projects? , 2003 .
[18] M. Asem Abdul-Malak,et al. Process Model for Administrating Construction Claims , 2002 .
[19] Andrew S. Chang. Reasons for cost and schedule increase for engineering design projects , 2002 .
[20] Bjørn Andersen,et al. Root Cause Analysis: Simplified Tools and Techniques , 1999 .
[21] Dennis F. Turner,et al. Building Contract Claims and Disputes , 1999 .
[22] Issaka Ndekugri,et al. Improving the management of claims on construction contracts: consultant's perspective , 1998 .
[23] M. Kumaraswamy,et al. Significant Sources of Construction Claims , 1998 .
[24] M. Kumaraswamy. Conflicts, claims and disputes in construction , 1997 .
[25] Mohan M. Kumaraswamy,et al. A comparative study of causes of time overruns in Hong Kong construction projects , 1997 .
[26] Gary David Holt,et al. Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .
[27] S. Ogunlana,et al. Construction delays in a fast-growing economy: Comparing Thailand with other economies , 1996 .
[28] Sadi Assaf,et al. Causes of Delay in Large Building Construction Projects , 1995 .
[29] Francis T. Hartman,et al. Construction Claims and Disputes: Causes and Cost/Time Overruns , 1994 .
[30] A. Uchechukwu Elinwa,et al. Construction Cost Factors in Nigeria , 1993 .
[31] F. Paul Wilson,et al. Root Cause Analysis : A Tool for Total Quality Management , 1993 .
[32] D. C. oksey C. Eshelman,et al. The quality toolbox , 1992 .
[33] Charles T. Jahren,et al. Predictors of Cost‐Overrun Rates , 1990 .
[34] Chris Hendrickson,et al. Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders , 1989 .
[35] Daniel C. Okpala,et al. Causes of High Costs of Construction in Nigeria , 1988 .
[36] James J. Adrian. Construction Claims: A Quantitative Approach , 1988 .
[37] James E. Diekmann,et al. Construction Claims: Frequency and Severity , 1985 .
[38] Maurice G. Kendall,et al. Rank Correlation Methods , 1949 .