Design Management in the Building Process - A Review of Current Literature

Abstract The architecture, engineering and construction (AEC) industry has experienced the declining productivity and some of this is due to deficiencies in building design. The focus on energy efficiency and sustainability makes it even more important to reduce such deficiencies. The managing of building design phases might be one of the most challenging forms of management in the AEC industry, i.e. it involves managing both outputs as drawings and creativity as minds. There must be enough room for creativity so that a building project can evolve to serve clients’ needs. There are pooled, sequential, reciprocal and intensive interdependencies in building design that need to be handled or coordinated differently.A particular building design phase most likely consists of all the four types, yet dominance shifts between them through sub-phases. The logic of creative processes is difficult to understand and, therefore, to manage properly.In this paper,thesefour interdependencies and their coordination are described based on the literature review. The key findings indicate that the reliance on the same management approach to handle both reflective and sequential dependencies might be contra productive.

[1]  Stephen Emmitt,et al.  The Value Universe: Defining a Value Based Approach to Lean Construction , 2005 .

[2]  S. Kozlowski,et al.  A Typology of Virtual Teams , 2002 .

[3]  Martin Fischer,et al.  Design Process Communication Methodology: Improving the Effectiveness and Efficiency of Collaboration, Sharing, and Understanding , 2014 .

[4]  Martin Fischer,et al.  Challenges and benefits of implementing virtual design and construction technologies for coordination of mechanical, electrical, and plumbing systems on a large healthcare project , 2007 .

[5]  Willy Sher,et al.  Measuring BIM performance: Five metrics , 2012 .

[6]  Peter E.D. Love,et al.  Quantifying the causes and costs of rework in construction , 2000 .

[7]  Rafael Sacks,et al.  Conceptualization of Interdependency and Coordination Between Construction Tasks , 2011 .

[8]  Alastair Blyth,et al.  Managing the Brief for Better Design , 2001 .

[9]  Sten Bonke,et al.  Facilitating Client Value Creation in the Conceptual Design Phase of Construction Projects: A Workshop Approach , 2010 .

[10]  Lotte Darsø,et al.  Innovationspædagogik: kunsten at fremelske innovationskompetence , 2011 .

[11]  Henry Mintzberg,et al.  Structure in Fives: Designing Effective Organizations , 1983 .

[12]  Frode Drevland,et al.  Collaborative Design Management – A Case Study , 2014 .

[13]  Eduardo Rosas Integrating the Design Structure Matrix and the Last Planner System Into Building Design , 2013 .

[14]  Lauri Koskela,et al.  On the Agenda of Design Management Research , 1998 .

[15]  Alan L. Gilbertson Briefing: Measuring the value of design , 2006 .

[16]  Kerry London,et al.  Towards the development of a conceptual design management model for remote sites , 2002 .

[17]  Iris D. Tommelein,et al.  Is the Last Planner System Applicable to Design? A Case Study , 2009 .

[18]  Jeffrey K. Pinto,et al.  Project Management: Achieving Competitive Advantage , 2003 .

[19]  Fredrik Svalestuen,et al.  Research Work on the Design Process Within the IGLC Conference , 2014 .

[20]  J. Alexander,et al.  Images of Organization , 1988 .

[21]  Stephen Emmitt,et al.  Design Team Communication and Design Task Complexity: The Preference for Dialogues , 2008 .

[22]  Will Hughes,et al.  Building Design Management , 2001 .

[23]  Nigel Ostime RIBA Architect's Handbook of Practice Management: 9th Edition , 2014 .

[24]  Z. Irani,et al.  Learning to Reduce Rework in Projects: Analysis of Firm's Organizational Learning and Quality Practices , 2003 .

[25]  José Clemente,et al.  BIM-lean synergies in the management on MEP works in public facilities of intensive use – a case study , 2013 .

[26]  Adam Baldwin,et al.  Modelling information flow during the conceptual and schematic stages of building design , 1999 .

[27]  James D. Thompson Organizations in Action: Social Science Bases of Administrative Theory , 1967 .

[28]  John Haymaker,et al.  Multidisciplinary process integration and design optimization of a classroom building , 2009, J. Inf. Technol. Constr..

[29]  Knut Anders Lia,et al.  Increase Predictability in Complex Engineering and Fabrication Projects , 2014 .

[30]  Stephen Emmitt,et al.  Collaborative Design Management , 2013 .

[31]  Azlan Shah Ali,et al.  The designer in refurbishment projects: implications to the compatibility of design , 2013 .

[32]  John W. Creswell,et al.  Research Design: Qualitative, Quantitative, and Mixed Methods Approaches , 2010 .

[33]  M. Alvesson,et al.  Reflexive Methodology: New Vistas for Qualitative Research , 2000, QMiP Bulletin.

[34]  Glenn Ballard,et al.  Positive Vs. Negative Iteration in Design , 2000 .

[35]  S. Emmitt,et al.  Perceptions of lean design management , 2013 .

[36]  Anita Moum Exploring Relations between the Architectural Design Process and ICT : Learning from Practitioners' Stories , 2008 .

[37]  Ying Wang,et al.  Modeling resource management in the building design process by information constraint Petri nets , 2013 .

[38]  Vegard Knotten,et al.  Integrated Methodology for Design Management – A Research Project to Improve Design Management for the AEC Industry in Norway , 2014 .

[39]  Nils O.E. Olsson,et al.  Layered Project–Layered Process: Lean Thinking and Flexible Solutions , 2011 .

[40]  Bryan Lawson,et al.  How Designers Think: The Design Process Demystified , 1990 .

[41]  Christine Pasquire,et al.  Exploring Value Concept Through the IGLC Community: Nineteen Years of Experience , 2012 .

[42]  Lauri Koskela,et al.  Which are the wastes of construction , 2013 .

[43]  Kathryn Best,et al.  Design Management: Managing Design Strategy, Process and Implementation , 2006 .