Hybrid (fuzzy-stochastic) modelling in construction operations management
暂无分享,去创建一个
Basil K. Papadopoulos | Demetrios Panagiotakopoulos | Konstantinos A. Chrysafis | Konstantinos A. Chrysafis | B. Papadopoulos | D. Panagiotakopoulos
[1] Chen-Tung Chen,et al. Applying fuzzy method for measuring criticality in project network , 2007, Inf. Sci..
[2] Pawel Zielinski,et al. Critical path analysis in the network with fuzzy activity times , 2001, Fuzzy Sets Syst..
[3] J. Buckley. Fuzzy Probability and Statistics , 2006 .
[4] C. McCahon. Using PERT as an approximation of fuzzy project-network analysis , 1993 .
[5] Ming Lu. Enhancing Project Evaluation and Review Technique Simulation through Artificial Neural Network-based Input Modeling , 2002 .
[6] Nitin Muttil,et al. Machine-learning paradigms for selecting ecologically significant input variables , 2007, Eng. Appl. Artif. Intell..
[7] Junzo Watada,et al. Capacitated two-stage facility location problem with fuzzy costs and demands , 2013, Int. J. Mach. Learn. Cybern..
[8] Simaan M. AbouRizk,et al. FITTING BETA DISTRIBUTIONS BASED ON SAMPLE DATA , 1994 .
[9] F. Lootsma. Stochastic and Fuzzy Pert , 1989 .
[10] T. Kotiah,et al. Another Look at the PERT Assumptions , 1973 .
[11] S. Chanas,et al. THE USE OF FUZZY VARIABLES IN PERT , 1981 .
[12] Wayne D. Cottrell,et al. Simplified Program Evaluation and Review Technique (PERT) , 1999 .
[13] Jing-Shing Yao,et al. Fuzzy critical path method based on signed distance ranking of fuzzy numbers , 2000, IEEE Trans. Syst. Man Cybern. Part A.
[14] Soumyo Moitra,et al. Skewness and the Beta Distribution , 1990 .
[15] Didier Dubois,et al. On latest starting times and floats in activity networks with ill-known durations , 2003, Eur. J. Oper. Res..
[16] Chuntian Cheng,et al. Using support vector machines for long-term discharge prediction , 2006 .
[17] W. H. Parks,et al. The Use of the Compound Poisson in Pert , 1969 .
[18] Joseph J. Moder,et al. Judgment Estimates of the Moments of Pert Type Distributions , 1968 .
[19] A. W. Wortham,et al. A Statistical Theory for PERT Critical Path Analysis , 1966 .
[20] Mitsuo Gen,et al. An efficient approach for large scale project planning based on fuzzy Delphi method , 1995, Fuzzy Sets Syst..
[21] Kwok-wing Chau,et al. A hybrid adaptive time-delay neural network model for multi-step-ahead prediction of sunspot activity , 2006 .
[22] Kwok-Wing Chau,et al. Palmprint identification using restricted fusion , 2008, Appl. Math. Comput..
[23] Heinrich Rommelfanger. Network analysis and information flow in fuzzy environment , 1994 .
[24] George J. Klir,et al. Fuzzy sets and fuzzy logic - theory and applications , 1995 .
[25] Margaret F. Shipley,et al. BIFPET methodology versus PERT in project management: fuzzy probability instead of the beta distribution , 1997 .
[26] Nicholas R. Farnum,et al. Some Results Concerning the Estimation of Beta Distribution Parameters in PERT , 1987 .
[27] Malay Kumar Kundu,et al. Interactive image retrieval using M-band wavelet, earth mover’s distance and fuzzy relevance feedback , 2012, Int. J. Mach. Learn. Cybern..
[28] L. Ringer. Numerical Operators for Statistical PERT Critical Path Analysis , 1969 .
[29] Chuntian Cheng,et al. Combining a fuzzy optimal model with a genetic algorithm to solve multi-objective rainfall–runoff model calibration , 2002 .
[30] Masatoshi Sakawa,et al. Fuzzy random bilevel linear programming through expectation optimization using possibility and necessity , 2012, Int. J. Mach. Learn. Cybern..
[31] E. W. Davis,et al. Project Management With Cpm, Pert and Precedence Diagramming , 1983 .
[32] R. Britney. Bayesian Point Estimation and the PERT Scheduling of Stochastic Activities , 1976 .
[33] S. H. Nasution. Fuzzy durations in critical path method , 1993, [Proceedings 1993] Second IEEE International Conference on Fuzzy Systems.
[34] S. H. Nasution. Fuzzy Critical Path Method , 1994, IEEE Trans. Syst. Man Cybern. Syst..
[35] D. Malcolm,et al. Application of a Technique for Research and Development Program Evaluation , 1959 .
[36] D Golenko-Ginzburg,et al. PERT assumptions revisited , 1989 .
[37] D. Golenko-Ginzburg. On the Distribution of Activity Time in PERT , 1988 .
[38] F A Lootsma,et al. THEORY AND METHODOLOGY STOCHASTIC AND FUZZY PERT , 1989 .
[39] Igor Gazdik. Fuzzy-Network Planning - FNET , 1983, IEEE Transactions on Reliability.
[40] Kwok-wing Chau,et al. Particle Swarm Optimization Training Algorithm for ANNs in Stage Prediction of Shing Mun River , 2006 .
[41] K. MacCrimmon,et al. An Analytical Study of the PERT Assumptions , 1964 .
[42] Janet Efstathiou,et al. Applications of fuzzy set methodologies in industrial engineering , 1990 .
[43] Ching-Hsue Cheng,et al. Application of fuzzy distributions on project management , 1995 .
[44] Madan M. Gupta,et al. Approximate reasoning in decision analysis , 1982 .
[45] Frank E. Grubbs. Letter to the Editor---Attempts to Validate Certain PERT Statistics or “Picking on PERT” , 1962 .
[46] T. T. Soong,et al. Fundamentals of Probability and Statistics for Engineers , 2004 .