Hybrid (fuzzy-stochastic) modelling in construction operations management

In this work we apply hybrid (fuzzy-stochastic) modelling in construction operations management (COM). One of the most prevailing methods for the COM is the Program (or Project) evaluation review technique, mostly known as PERT. Nevertheless, both classic and fuzzy PERT presents evident drawbacks. Such drawbacks are the subjectivity of estimates for activity durations, the specification to a certain beta distribution and the assumption for applicability of this probability distribution to all project activities. Regarding the fuzzy PERT, a major drawback is the arbitrary choice of fuzzy numbers for the activity duration. In an attempt to reduce these drawbacks and reach more realistic results we propose an alternative hybrid (fuzzy-stochastic) approach. By combining the generalized beta distribution and the fuzzy estimators method, we find the fuzzy activity times (earliest start/finish—latest start/finish) of a project network and also a fuzzy probability for an activity’s duration to be in a certain time interval. A numerical example is given for thorough comprehension of the proposed method.

[1]  Chen-Tung Chen,et al.  Applying fuzzy method for measuring criticality in project network , 2007, Inf. Sci..

[2]  Pawel Zielinski,et al.  Critical path analysis in the network with fuzzy activity times , 2001, Fuzzy Sets Syst..

[3]  J. Buckley Fuzzy Probability and Statistics , 2006 .

[4]  C. McCahon Using PERT as an approximation of fuzzy project-network analysis , 1993 .

[5]  Ming Lu Enhancing Project Evaluation and Review Technique Simulation through Artificial Neural Network-based Input Modeling , 2002 .

[6]  Nitin Muttil,et al.  Machine-learning paradigms for selecting ecologically significant input variables , 2007, Eng. Appl. Artif. Intell..

[7]  Junzo Watada,et al.  Capacitated two-stage facility location problem with fuzzy costs and demands , 2013, Int. J. Mach. Learn. Cybern..

[8]  Simaan M. AbouRizk,et al.  FITTING BETA DISTRIBUTIONS BASED ON SAMPLE DATA , 1994 .

[9]  F. Lootsma Stochastic and Fuzzy Pert , 1989 .

[10]  T. Kotiah,et al.  Another Look at the PERT Assumptions , 1973 .

[11]  S. Chanas,et al.  THE USE OF FUZZY VARIABLES IN PERT , 1981 .

[12]  Wayne D. Cottrell,et al.  Simplified Program Evaluation and Review Technique (PERT) , 1999 .

[13]  Jing-Shing Yao,et al.  Fuzzy critical path method based on signed distance ranking of fuzzy numbers , 2000, IEEE Trans. Syst. Man Cybern. Part A.

[14]  Soumyo Moitra,et al.  Skewness and the Beta Distribution , 1990 .

[15]  Didier Dubois,et al.  On latest starting times and floats in activity networks with ill-known durations , 2003, Eur. J. Oper. Res..

[16]  Chuntian Cheng,et al.  Using support vector machines for long-term discharge prediction , 2006 .

[17]  W. H. Parks,et al.  The Use of the Compound Poisson in Pert , 1969 .

[18]  Joseph J. Moder,et al.  Judgment Estimates of the Moments of Pert Type Distributions , 1968 .

[19]  A. W. Wortham,et al.  A Statistical Theory for PERT Critical Path Analysis , 1966 .

[20]  Mitsuo Gen,et al.  An efficient approach for large scale project planning based on fuzzy Delphi method , 1995, Fuzzy Sets Syst..

[21]  Kwok-wing Chau,et al.  A hybrid adaptive time-delay neural network model for multi-step-ahead prediction of sunspot activity , 2006 .

[22]  Kwok-Wing Chau,et al.  Palmprint identification using restricted fusion , 2008, Appl. Math. Comput..

[23]  Heinrich Rommelfanger Network analysis and information flow in fuzzy environment , 1994 .

[24]  George J. Klir,et al.  Fuzzy sets and fuzzy logic - theory and applications , 1995 .

[25]  Margaret F. Shipley,et al.  BIFPET methodology versus PERT in project management: fuzzy probability instead of the beta distribution , 1997 .

[26]  Nicholas R. Farnum,et al.  Some Results Concerning the Estimation of Beta Distribution Parameters in PERT , 1987 .

[27]  Malay Kumar Kundu,et al.  Interactive image retrieval using M-band wavelet, earth mover’s distance and fuzzy relevance feedback , 2012, Int. J. Mach. Learn. Cybern..

[28]  L. Ringer Numerical Operators for Statistical PERT Critical Path Analysis , 1969 .

[29]  Chuntian Cheng,et al.  Combining a fuzzy optimal model with a genetic algorithm to solve multi-objective rainfall–runoff model calibration , 2002 .

[30]  Masatoshi Sakawa,et al.  Fuzzy random bilevel linear programming through expectation optimization using possibility and necessity , 2012, Int. J. Mach. Learn. Cybern..

[31]  E. W. Davis,et al.  Project Management With Cpm, Pert and Precedence Diagramming , 1983 .

[32]  R. Britney Bayesian Point Estimation and the PERT Scheduling of Stochastic Activities , 1976 .

[33]  S. H. Nasution Fuzzy durations in critical path method , 1993, [Proceedings 1993] Second IEEE International Conference on Fuzzy Systems.

[34]  S. H. Nasution Fuzzy Critical Path Method , 1994, IEEE Trans. Syst. Man Cybern. Syst..

[35]  D. Malcolm,et al.  Application of a Technique for Research and Development Program Evaluation , 1959 .

[36]  D Golenko-Ginzburg,et al.  PERT assumptions revisited , 1989 .

[37]  D. Golenko-Ginzburg On the Distribution of Activity Time in PERT , 1988 .

[38]  F A Lootsma,et al.  THEORY AND METHODOLOGY STOCHASTIC AND FUZZY PERT , 1989 .

[39]  Igor Gazdik Fuzzy-Network Planning - FNET , 1983, IEEE Transactions on Reliability.

[40]  Kwok-wing Chau,et al.  Particle Swarm Optimization Training Algorithm for ANNs in Stage Prediction of Shing Mun River , 2006 .

[41]  K. MacCrimmon,et al.  An Analytical Study of the PERT Assumptions , 1964 .

[42]  Janet Efstathiou,et al.  Applications of fuzzy set methodologies in industrial engineering , 1990 .

[43]  Ching-Hsue Cheng,et al.  Application of fuzzy distributions on project management , 1995 .

[44]  Madan M. Gupta,et al.  Approximate reasoning in decision analysis , 1982 .

[45]  Frank E. Grubbs Letter to the Editor---Attempts to Validate Certain PERT Statistics or “Picking on PERT” , 1962 .

[46]  T. T. Soong,et al.  Fundamentals of Probability and Statistics for Engineers , 2004 .