Addressing information flow in lean production management and control in construction

Traditionally, production control on construction sites has been a challenging area, where the ad-hoc production control methods foster uncertainty - one of the biggest enemies of efficiency and smooth production flow. Lean construction methods such as the Last Planner System have partially tackled this problem by addressing the flow aspect through means such as constraints analysis and commitment planning. However, such systems have relatively long planning cycles to respond to the dynamic production requirements of construction, where almost daily if not hourly control is needed. New solutions have been designed by researchers to improve this aspect such as VisiLean, but again these types of software systems require the proximity and availability of computer devices to workers. Given this observation, there is a need for a communication system between the field and site office that is highly interoperable and provides real-time task status information. A High-level communication framework (using VisiLean) is presented in this paper, which aims to overcome the problems of system integration and improve the flow of information within the production system. The framework provides, among other things, generic and standardized interfaces to simplify the “push” and “pull” of the right (production) information, whenever needed, wherever needed, by whoever needs it. Overall, it is anticipated that the reliability of the production control will be improved

[1]  Gregory A. Howell,et al.  SHIELDING PRODUCTION: ESSENTIAL STEP IN PRODUCTION CONTROL , 1998 .

[2]  Lauri Koskela,et al.  An exploration towards a production theory and its application to construction , 2000 .

[3]  Lucio Soibelman,et al.  Data Preparation Process for Construction Knowledge Generation through Knowledge Discovery in Databases , 2002 .

[4]  Yacine Rezgui,et al.  An information management model for concurrent construction engineering , 1996 .

[5]  Tao Cheng,et al.  Automated task-level activity analysis through fusion of real time location sensors and worker's tho , 2013 .

[6]  J. Rodney Turner,et al.  THE HANDBOOK OF PROJECT-BASED MANAGEMENT , 2008 .

[7]  Carlos Torres Formoso,et al.  A knowledge based framework for planning house building projects , 1991 .

[8]  Kary Främling,et al.  QLM Messaging Standards: Introduction and Comparison with Existing Messaging Protocols , 2014, Service Orientation in Holonic and Multi-Agent Manufacturing and Robotics.

[9]  Rafael Sacks,et al.  Assessing research issues in Automated Project Performance Control (APPC) , 2007 .

[10]  Tariq S. Abdelhamid,et al.  Physical Demands of Construction Work: A Source of Workflow Unreliability , 2002 .

[11]  Tuan Anh Nguyen,et al.  Energy intelligent buildings based on user activity: A survey , 2013 .

[12]  Boyd C. Paulson,et al.  Site‐Level Construction Information System , 1992 .

[13]  Carlos H. Caldas,et al.  Automated Classification Methods: Supporting the Implementation of Pull Techniques for Information Flow Management , 2002 .

[14]  Bhargav Dave,et al.  Improving information flow within the production management system with web services , 2010 .

[15]  Richard L. Tucker,et al.  Is construction project planning really doing its job? A critical examination of focus, role and process , 1987 .

[16]  Olli Seppänen,et al.  Production Control using Location-Based Management System on a Hospital Construction Project , 2012 .

[17]  Omer Tatari,et al.  Current state of construction enterprise information systems: survey research , 2007 .

[18]  Olli Seppänen Empirical Research on the Success of Production Control in Building Construction Projects , 2009 .

[19]  Herman Glenn Ballard,et al.  THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .

[20]  Thomas Froese,et al.  The impact of emerging information technology on project management for construction , 2010 .

[21]  Jan Holmström,et al.  Sustainable PLM through Intelligent Products , 2013, Eng. Appl. Artif. Intell..

[22]  Rafael Sacks,et al.  Requirements for building information modeling based lean production management systems for construction , 2010 .

[23]  Kerry London,et al.  Construction Supply Chain Management Handbook , 2008 .

[24]  Paul M. Goodrum,et al.  Construction Craft Workers’ Perceptions of the Factors Affecting Their Productivity , 2009 .

[25]  Francis G. McCabe,et al.  Reference Model for Service Oriented Architecture 1.0 , 2006 .

[26]  Carlos Torres Formoso,et al.  Production Planning and Control and the Coordination of Project Supply Chains , 2008 .

[27]  Carlos T. Formoso,et al.  Improving Performance Through Measurement: The Application of Lean Production and Organisational Learning Principles , 2000 .

[28]  Olli Seppänen,et al.  Case study of using an integrated 5D system in a large hospital construction project , 2010 .

[29]  Bhargav Dave Developing a construction management system based on lean construction and building information modelling , 2013 .

[30]  Gregory A. Howell,et al.  Can Project Controls Do Its Job , 1996 .