Assembly unit partitioning for hull structure in shipbuilding

In order to solve the problem that low automatic degree to the block assembly process design will negatively influence construction cycle time and construction quality in shipbuilding, this paper presents a newly developed determination system of assembly units for the hull structure. Firstly, the assembly information model of a hull block which includes the part information and the linkage information between parts is proposed following the structural features and assembly process of the hull structure. Secondly, the assembly relation matrix is established on the basis of the fuzzy assessment rule and then the fuzzy clustering method to analyze partition of assembly units is given out. Thirdly, through analyzing the assembly ability of hull structures, the set of evaluating indexes is founded whose weights are decided by an analytic hierarchy process (AHP). Meanwhile, the model for the assessment is provided by fuzzy synthetic evaluation (FSE) and the comprehensive assessment values of assembly partition schemes can be computed to judge the final optimization scheme. A block assembly is taken as an example to verify the proposed method, and the results show that it is an effective method for solving the partition problem of hull structures.

[1]  Jeonghan Ko,et al.  An assembly decomposition model for subassembly planning considering imperfect inspection to reduce assembly defect rates , 2013 .

[2]  Dong Xiang,et al.  Subassembly identification based on grey clustering , 2008 .

[3]  Zhijian Lu,et al.  The Study on Venture Capital Project Appraisal using AHP-Fuzzy Comprehensive Evaluation Methods , 2011 .

[4]  Jan Wolter,et al.  A structure-oriented approach to assembly sequence planning , 1997, IEEE Trans. Robotics Autom..

[5]  Hoel Le Capitaine,et al.  A Cluster-Validity Index Combining an Overlap Measure and a Separation Measure Based on Fuzzy-Aggregation Operators , 2011, IEEE Transactions on Fuzzy Systems.

[6]  Yoonho Seo,et al.  Block assembly planning in shipbuilding using case-based reasoning , 2007, Expert Syst. Appl..

[7]  Zhongqin Lin,et al.  Automated sequencing and sub-assembly detection in automobile body assembly planning , 2002 .

[8]  Zhen,et al.  COMPUTER-AIDED BLOCK ASSEMBLY PROCESS PLANNING IN SHIPBUILDING BASED ON RULE-REASONING , 2008 .

[9]  Sukhan Lee Subassembly identification and evaluation for assembly planning , 1994, IEEE Trans. Syst. Man Cybern..

[10]  Soo-Hong Lee,et al.  An Automatic Process-Planning System for Block Assembly in Shipbuilding , 1996 .

[11]  Jia-hua Tan,et al.  Production balance of ship erection , 2008 .

[12]  Yuan Li,et al.  Effective component disassembly approach for aircraft assembly based on fuzzy-clustering algorithm , 2008, 2008 IEEE/ASME International Conference on Advanced Intelligent Mechatronics.

[13]  Na Wang,et al.  A fuzzy modeling method via Enhanced Objective Cluster Analysis for designing TSK model , 2009, Expert Syst. Appl..

[14]  Sun Jin,et al.  Assembly sequence planning of automobile body components based on liaison graph , 2007 .

[15]  Kyu-Yeul Lee,et al.  Ship Block Assembly Modeling Based on the Graph Theory , 2000 .

[16]  Witold Pedrycz,et al.  Use of a fuzzy granulation-degranulation criterion for assessing cluster validity , 2011, Fuzzy Sets Syst..

[17]  Maolin Cai,et al.  Mechanical Properties Evaluation for Pneumatic Actuator and Electric Actuator Based on AHP-FCE , 2010, 2010 WASE International Conference on Information Engineering.

[18]  Wang Baosen,et al.  Study of the Supply Chain Operational Risk Based on Fuzzy Comprehensive Evaluation , 2011 .

[19]  Xinmin Lai,et al.  Automated Hierarchical Assembly System Construction in Automobile Body Assembly Planning , 2005 .

[20]  Jianfeng Yang,et al.  Criticality evaluation of petrochemical equipment based on fuzzy comprehensive evaluation and a BP neural network , 2009 .

[21]  Wang Bo,et al.  Quality assurance model in mechanical assembly , 2010 .

[22]  Kyu-Yeul Lee,et al.  Development of a semantic product modeling system for initial hull structure in shipbuilding , 2004 .

[23]  H. ElMaraghy,et al.  A model for measuring products assembly complexity , 2010, Int. J. Comput. Integr. Manuf..

[24]  Yong Wang,et al.  Subassembly identification for assembly sequence planning , 2013 .

[25]  Jun Liu,et al.  Geometric computation based assembly sequencing and evaluating in terms of assembly angle, direction, reorientation, and stability , 2009, Comput. Aided Des..

[26]  Jong Gye Shin,et al.  Geometric assessment for fabrication of large hull pieces in shipbuilding , 2007, Comput. Aided Des..

[27]  Wen Jun Hou,et al.  The Research of Hierarchy Assembly Semantic Model Based on Intelligent Assembly Process Planning , 2011 .

[28]  Zhou-Ping Yin,et al.  A connector-based hierarchical approach to assembly sequence planning for mechanical assemblies , 2003, Comput. Aided Des..

[29]  N. S. Ong,et al.  Automatic Subassembly Detection from a Product Model for Disassembly Sequence Generation , 1999 .