Assembly unit partitioning for hull structure in shipbuilding
暂无分享,去创建一个
[1] Jeonghan Ko,et al. An assembly decomposition model for subassembly planning considering imperfect inspection to reduce assembly defect rates , 2013 .
[2] Dong Xiang,et al. Subassembly identification based on grey clustering , 2008 .
[3] Zhijian Lu,et al. The Study on Venture Capital Project Appraisal using AHP-Fuzzy Comprehensive Evaluation Methods , 2011 .
[4] Jan Wolter,et al. A structure-oriented approach to assembly sequence planning , 1997, IEEE Trans. Robotics Autom..
[5] Hoel Le Capitaine,et al. A Cluster-Validity Index Combining an Overlap Measure and a Separation Measure Based on Fuzzy-Aggregation Operators , 2011, IEEE Transactions on Fuzzy Systems.
[6] Yoonho Seo,et al. Block assembly planning in shipbuilding using case-based reasoning , 2007, Expert Syst. Appl..
[7] Zhongqin Lin,et al. Automated sequencing and sub-assembly detection in automobile body assembly planning , 2002 .
[8] Zhen,et al. COMPUTER-AIDED BLOCK ASSEMBLY PROCESS PLANNING IN SHIPBUILDING BASED ON RULE-REASONING , 2008 .
[9] Sukhan Lee. Subassembly identification and evaluation for assembly planning , 1994, IEEE Trans. Syst. Man Cybern..
[10] Soo-Hong Lee,et al. An Automatic Process-Planning System for Block Assembly in Shipbuilding , 1996 .
[11] Jia-hua Tan,et al. Production balance of ship erection , 2008 .
[12] Yuan Li,et al. Effective component disassembly approach for aircraft assembly based on fuzzy-clustering algorithm , 2008, 2008 IEEE/ASME International Conference on Advanced Intelligent Mechatronics.
[13] Na Wang,et al. A fuzzy modeling method via Enhanced Objective Cluster Analysis for designing TSK model , 2009, Expert Syst. Appl..
[14] Sun Jin,et al. Assembly sequence planning of automobile body components based on liaison graph , 2007 .
[15] Kyu-Yeul Lee,et al. Ship Block Assembly Modeling Based on the Graph Theory , 2000 .
[16] Witold Pedrycz,et al. Use of a fuzzy granulation-degranulation criterion for assessing cluster validity , 2011, Fuzzy Sets Syst..
[17] Maolin Cai,et al. Mechanical Properties Evaluation for Pneumatic Actuator and Electric Actuator Based on AHP-FCE , 2010, 2010 WASE International Conference on Information Engineering.
[18] Wang Baosen,et al. Study of the Supply Chain Operational Risk Based on Fuzzy Comprehensive Evaluation , 2011 .
[19] Xinmin Lai,et al. Automated Hierarchical Assembly System Construction in Automobile Body Assembly Planning , 2005 .
[20] Jianfeng Yang,et al. Criticality evaluation of petrochemical equipment based on fuzzy comprehensive evaluation and a BP neural network , 2009 .
[21] Wang Bo,et al. Quality assurance model in mechanical assembly , 2010 .
[22] Kyu-Yeul Lee,et al. Development of a semantic product modeling system for initial hull structure in shipbuilding , 2004 .
[23] H. ElMaraghy,et al. A model for measuring products assembly complexity , 2010, Int. J. Comput. Integr. Manuf..
[24] Yong Wang,et al. Subassembly identification for assembly sequence planning , 2013 .
[25] Jun Liu,et al. Geometric computation based assembly sequencing and evaluating in terms of assembly angle, direction, reorientation, and stability , 2009, Comput. Aided Des..
[26] Jong Gye Shin,et al. Geometric assessment for fabrication of large hull pieces in shipbuilding , 2007, Comput. Aided Des..
[27] Wen Jun Hou,et al. The Research of Hierarchy Assembly Semantic Model Based on Intelligent Assembly Process Planning , 2011 .
[28] Zhou-Ping Yin,et al. A connector-based hierarchical approach to assembly sequence planning for mechanical assemblies , 2003, Comput. Aided Des..
[29] N. S. Ong,et al. Automatic Subassembly Detection from a Product Model for Disassembly Sequence Generation , 1999 .