Project Scheduling with Stochastic Activity Interruptions

In this chapter we address the problem of scheduling the activities of a resource-constrained project, some of which may be interrupted by an uncertain amount of time. The resources may be, for example, machines in a jobshop, computers with specialized software packages (as those needed for engineering designs), or highly specialized technicians.

[1]  R. Tyrrell Rockafellar,et al.  Scenarios and Policy Aggregation in Optimization Under Uncertainty , 1991, Math. Oper. Res..

[2]  Dimitri Golenko-Ginzburg,et al.  Stochastic network project scheduling with non-consumable limited resources , 1997 .

[3]  Robert L. Armacost,et al.  The role of the nonanticipativity constraint in commercial software for stochastic project scheduling , 1996 .

[4]  Rolf H. Möhring,et al.  Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time , 1984, Oper. Res..

[5]  Abel A. Fernandez An optimal solution to the resource constrained project scheduling problem with stochastic task durations , 1995 .

[6]  Dale F. Cooper,et al.  Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation , 1976 .

[7]  Jeffrey D. Ullman,et al.  NP-Complete Scheduling Problems , 1975, J. Comput. Syst. Sci..

[8]  Vincent A. Mabert,et al.  Evaluating project scheduling and due date assignment procedures: an experimental analysis , 1988 .

[9]  Robert J. Vanderbei,et al.  Robust Optimization of Large-Scale Systems , 1995, Oper. Res..

[10]  Edward C. Sewell,et al.  Heuristic, optimal, static, and dynamic schedules when processing times are uncertain , 1997 .

[11]  Fred W. Glover,et al.  A Template for Scatter Search and Path Relinking , 1997, Artificial Evolution.

[12]  Thomas E. Morton,et al.  Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics , 1993 .

[13]  Ron S. Dembo,et al.  Scenario optimization , 1991, Ann. Oper. Res..