THEORY AND METHODOLOGY STOCHASTIC AND FUZZY PERT
暂无分享,去创建一个
[1] George B. Kleindorfer,et al. Bounding Distributions for a Stochastic Acyclic Network , 1971, Oper. Res..
[2] A. Nadas,et al. Probabilistic PERT , 1979 .
[3] C. E. Clark. The Greatest of a Finite Set of Random Variables , 1961 .
[4] D. Malcolm,et al. Application of a Technique for Research and Development Program Evaluation , 1959 .
[5] A. W. Wortham,et al. A Statistical Theory for PERT Critical Path Analysis , 1966 .
[6] W. Pedrycz,et al. A fuzzy extension of Saaty's priority theory , 1983 .
[7] John M. Burt,et al. Conditional Monte Carlo: A Simulation Technique for Stochastic Network Analysis , 1971 .
[8] S. Chanas,et al. THE USE OF FUZZY VARIABLES IN PERT , 1981 .
[9] D. R. Fulkerson. Expected Critical Path Lengths in PERT Networks , 1962 .
[10] Pierre N. Robillard,et al. The Completion Time of PERT Networks , 1977, Oper. Res..
[11] D. Dubois,et al. Operations on fuzzy numbers , 1978 .
[12] H. J. Cleef,et al. Project scheduling via stochastic programming 1 , 1982 .
[13] F. A. Lootsma. Network planning with stochastic activity durations, an evaluation of PERT , 1966 .
[14] W. K. Haneveld. Robustness against dependence in PERT: An application of duality and distributions with known marginals , 1986 .
[15] S. Elmaghraby. On the Expected Duration of PERT Type Networks , 1967 .
[16] J. J. Martin. Distribution of the Time Through a Directed, Acyclic Network , 1965 .
[17] K. MacCrimmon,et al. An Analytical Study of the PERT Assumptions , 1964 .
[18] Andrew W. Shogan. Bounding distributions for a stochastic pert network , 1977, Networks.