THEORY AND METHODOLOGY STOCHASTIC AND FUZZY PERT

Network-planning techniques are considered based on stochastic and fuzzy models of the activity durations. The stochastic versions of Pert are generally intractable, and they cannot be used to draw up tight plans for action. Fuzzy models are closer to reality, simpler to use, but theoretically not well established. The impact of a stochastic and a fuzzy version of Pert is illustrated via a numerical example. Finally, the representation of uncertainty in network planning is discussed, when the activity durations are estimated by human experts.

[1]  George B. Kleindorfer,et al.  Bounding Distributions for a Stochastic Acyclic Network , 1971, Oper. Res..

[2]  A. Nadas,et al.  Probabilistic PERT , 1979 .

[3]  C. E. Clark The Greatest of a Finite Set of Random Variables , 1961 .

[4]  D. Malcolm,et al.  Application of a Technique for Research and Development Program Evaluation , 1959 .

[5]  A. W. Wortham,et al.  A Statistical Theory for PERT Critical Path Analysis , 1966 .

[6]  W. Pedrycz,et al.  A fuzzy extension of Saaty's priority theory , 1983 .

[7]  John M. Burt,et al.  Conditional Monte Carlo: A Simulation Technique for Stochastic Network Analysis , 1971 .

[8]  S. Chanas,et al.  THE USE OF FUZZY VARIABLES IN PERT , 1981 .

[9]  D. R. Fulkerson Expected Critical Path Lengths in PERT Networks , 1962 .

[10]  Pierre N. Robillard,et al.  The Completion Time of PERT Networks , 1977, Oper. Res..

[11]  D. Dubois,et al.  Operations on fuzzy numbers , 1978 .

[12]  H. J. Cleef,et al.  Project scheduling via stochastic programming 1 , 1982 .

[13]  F. A. Lootsma Network planning with stochastic activity durations, an evaluation of PERT , 1966 .

[14]  W. K. Haneveld Robustness against dependence in PERT: An application of duality and distributions with known marginals , 1986 .

[15]  S. Elmaghraby On the Expected Duration of PERT Type Networks , 1967 .

[16]  J. J. Martin Distribution of the Time Through a Directed, Acyclic Network , 1965 .

[17]  K. MacCrimmon,et al.  An Analytical Study of the PERT Assumptions , 1964 .

[18]  Andrew W. Shogan Bounding distributions for a stochastic pert network , 1977, Networks.