Distributed job scheduling on computational Grids using multiple simultaneous requests
暂无分享,去创建一个
P. Sadayappan | Rajkumar Kettimuthu | Srividya Srinivasan | Vijay Subramani | P. Sadayappan | R. Kettimuthu | Vijay Subramani | Srividya Srinivasan
[1] Ian T. Foster,et al. Globus: a Metacomputing Infrastructure Toolkit , 1997, Int. J. High Perform. Comput. Appl..
[2] Ramin Yahyapour,et al. Design and evaluation of job scheduling strategies for grid computing , 2000, GRID.
[3] Dror G. Feitelson,et al. Utilization, Predictability, Workloads, and User Runtime Estimates in Scheduling the IBM SP2 with Backfilling , 2001, IEEE Trans. Parallel Distributed Syst..
[4] Ian T. Foster,et al. Condor-G: A Computation Management Agent for Multi-Institutional Grids , 2004, Cluster Computing.
[5] Jörn Gehring,et al. Scheduling a Metacomputer with Uncooperative Sub-schedulers , 1999, JSSPP.
[6] Achim Streit,et al. Robust resource management for metacomputers , 2000, Proceedings the Ninth International Symposium on High-Performance Distributed Computing.
[7] Mark J. Clement,et al. The Performance Impact of Advance Reservation Meta-scheduling , 2000, JSSPP.
[8] Warren Smith,et al. A Resource Management Architecture for Metacomputing Systems , 1998, JSSPP.
[9] Andrew S. Grimshaw,et al. The Legion vision of a worldwide virtual computer , 1997, Commun. ACM.
[10] Francine Berman,et al. The AppLeS Parameter Sweep Template: User-Level Middleware for the Grid , 2000, ACM/IEEE SC 2000 Conference (SC'00).
[11] Dror G. Feitelson,et al. Utilization and Predictability in Scheduling the IBM SP2 with Backfilling , 1998, Proceedings of the First Merged International Parallel Processing Symposium and Symposium on Parallel and Distributed Processing.
[12] Mathilde Romberg. The UNICORE architecture: seamless access to distributed resources , 1999, Proceedings. The Eighth International Symposium on High Performance Distributed Computing (Cat. No.99TH8469).
[13] P. D. Coddington,et al. Scheduling Independent Tasks on Metacomputing Systems , 1999 .